001
Earth
Topsoil
002
Earth
Sub-topsoil
003
Architecture
E-W wall frag
004
Earth
Post-occupational debris
005
Architecture
E-W wall
006
Earth
Beaten-earth surface
007
Architecture
E-W wall
008
Architecture
N-S wall
009
Installation
Bedrock
010
Earth
Beaten-earth surface frag
011
Earth
Fill below Surf 10
012
Architecture
N-S wall
013
Earth
Fill below Surf 10
014
Earth
Debris immediately above Surf 16
015
Installation
Plaster installation or surface
016
Earth
Beaten-earth surface between E balk & Wall 8
017
Earth
Probe in SE corner
018
Earth
Soft debris below Surf 16
019
Earth
Soft earth between N end of Surf 16 & E extension of Wall 5
020
Earth
Probe in SW corner to clear soft fill above L 22
021
Earth
Beaten-earth surface in SW corner under Wall 3
022
Earth
Hard debris below L 13, 21 along s balk
023
Earth
Series of hard earth & plaster surfaces over all of S 1/3 of square, S of Wall 7
024
Earth
Debris below Wall 7 (later phase), above Surf 23
025
Earth
Ashy debris under Surf 6 to bedrock
026
Earth
Ashy pocket in NE corner, N of Wall 5, below Surf 6
027
Architecture
N-S wall in NE corner, below Surf 6
028
Earth
Debris between dip in bedrock & N balk