Architecture
E-W wall frag
Earth
Post-occupational debris
Earth
Beaten-earth surface
Earth
Beaten-earth surface frag
Earth
Debris immediately above Surf 16
Installation
Plaster installation or surface
Earth
Beaten-earth surface between E balk & Wall 8
Earth
Soft debris below Surf 16
Earth
Soft earth between N end of Surf 16 & E extension of Wall 5
Earth
Probe in SW corner to clear soft fill above L 22
Earth
Beaten-earth surface in SW corner under Wall 3
Earth
Hard debris below L 13, 21 along s balk
Earth
Series of hard earth & plaster surfaces over all of S 1/3 of square, S of Wall 7
Earth
Debris below Wall 7 (later phase), above Surf 23
Earth
Ashy debris under Surf 6 to bedrock
Earth
Ashy pocket in NE corner, N of Wall 5, below Surf 6
Architecture
N-S wall in NE corner, below Surf 6
Earth
Debris between dip in bedrock & N balk