Earth
Compact occupational debris layer
Installation
Pit with boulder fill
Architecture
N-S wall in E
Earth
Tumble E of Wwall 5
Earth
Packed earth W of Wall 5
Earth
Arbitrary excavation unit of fill W of Wall 5
Earth
Compact layer below L 9, W of Wall 5
Earth
Beaten-earth surface E of Wall 5 below 11 & above 13
Earth
Beaten-earth surface beneath tumble E of Wall 5
Earth
Compact earth beneath L 10
Earth
Dry layer E of Wall 5
Earth
Occupational debris E of Wall 5 & above Walls 20 & 21
Earth
occupational debris next to Wall 20/21
Earth
Compact debris with Wall 20
Architecture
S & lower half of N-S wall E & below Wall 5
Architecture
N part of N-S wall below Wall 5
Earth
Debris W of Wall 5 & below L 14
Earth
Debris W of Wall 5 & below L 22
Earth
Cobbley soil in NW probe
Architecture
N-S wall of cobble-sized stones in NW probe
Earth
Debris E of Wall 25 & W of Wall 5
Earth
Probe in NE corner at a level below Wall 21
Earth
Soil exposed W of Wall 25 in probe
Installation
Cobble surface between Wall 25 & the base of Wall 5