Locus F.6M90.005

General Information

Locus Type:

Architecture

Supervisor:

T. Wehtje

Designation:

N-S wall in E

Reason:

Stones in a line

Top Separation:

Very Clear

Bottom Separation:

Very Clear

Start Date:

04 Jul, 1989

End Date:

03 Aug, 1989

Interpretation

Function:

Terrace wall, built against & supported by layers at least as high as the top of L 10 to the W; it would have served to retain the soil above the much lower level at its base on its E side

Stratigraphy remarks:

Based on the readings from L 17, etc, at the base of the wall on the E, an Ir1 date is clear; Ir1 L 17, 16, 15, 13, & 12 all were in use with the wall; above that level, in loci 11, 8, & 6, is much tumble; the wall may have fallen into disuse by Ir2; this wall seems to have been built on top of Walls 20 & 21; the date for those is still tentative-- perhaps earlier than LB, maybe even MB, based on 27's reading

Balk:

Phase:

Stratum :

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

Hard

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

5

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

20

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

25

Cobble (6-25 cm) %:

50

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

50

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Battered

Tendencies:

Courses

Highest Count:

0

Lowest Count:

6

Random:

false

Rows

Highest Count:

2

Lowest Count:

1

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

5

Greatest width in meters:

0.8

Smallest width in meters:

0.5

Greatest Height in meters:

1.75

Lowest Height in meters:

1.2

Orientation (degrees):

160

Dip (degrees):

0

Preservation

Preservation:

Partial Superstructure: Most

Lean Direction (degrees):

270

Lean Degrees:

5

Top Foundation Level:

0.0

Remarks

Remarks:

Tendencies: large boulders at bottom; leans more at N end; intent more size + as a barrier/bulk strength than form - it slumps

Levels

Location Top Level Bottom Level
10 905.05 0
22 905.05 0
34 904.95 0

Stratigraphy

Under Earth layer F6M90:001
Over Wall F6M90:020
Over Wall F6M90:021
Sealed agnst by Earth layer F6M90:007
Sealed agnst by Earth layer F6M90:002
Sealed agnst by Earth layer F6M90:006
Sealed agnst by Earth layer F6M90:008
Sealed agnst by Earth layer F6M90:011
Sealed agnst by Earth layer F6M90:007
Sealed agnst by Earth layer F6M90:003
Sealed agnst by Pit F6M90:004
Sealed agnst by Earth layer F6M90:009
Sealed agnst by Earth layer F6M90:010
Sealed agnst by Earth layer F6M90:011
Sealed agnst by Surface F6M90:012
Sealed agnst by Surface F6M90:013
Sealed agnst by Earth layer F6M90:014
Sealed agnst by Earth layer F6M90:016
Sealed agnst by Earth layer F6M90:017
Sealed agnst by Earth layer F6M90:022
Sealed agnst by Earth layer F6M90:023
Sealed agnst by Earth layer F6M90:024
Sealed agnst by Earth layer F6M90:026

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
04 Jul, 1989 89F90451 Progress
05 Jul, 1989 89F90453 Progress
06 Jul, 1989 89F90454 Progress
07 Jul, 1989 89F90455 Progress
10 Jul, 1989 89F90456 Progress
12 Jul, 1989 89F90458 Progress
13 Jul, 1989 89F90459 Progress
14 Jul, 1989 89F90460 Progress
17 Jul, 1989 89F90461 Progress
18 Jul, 1989 89F90462 Progress
19 Jul, 1989 89F90463 Progress
20 Jul, 1989 89F90464 Progress
20 Jul, 1989 89F90465 Progress
25 Jul, 1989 89F90466 Progress
26 Jul, 1989 89F90467 Progress
27 Jul, 1989 89F90468 Progress
28 Jul, 1987 89F90469 Progress
02 Aug, 1989 89F90472 Progress
03 Aug, 1989 89F90473 Progress
11 Jul, 1989 89F90457 Progress
26 Jul, 1989 89F98438 Progress
04 Aug, 1989 89F99447 Final
31 Jul, 1989 89F90470 Progress
04 Aug, 1989 89F90476 Final