Earth
Rock rubble & sub-topsoil
Earth
Exposure surface with Wall 4
Earth
Loose occupational debris layer; poss surface
Architecture
Terrace wall
Earth
Consolidated debris layer or exposure surface
Earth
Occupational debris layer E of Wall 6
Installation
Earth-lined pit
Earth
Exposure surface E of Wall 19
Earth
Compact exposure surface under L 3
Earth
Beaten-earth surface under Wall 4
Earth
Occupational debris under L 2 E of Wall 14
Architecture
N-S wall N of Wall 4
Earth
Exposure surface under 11; in NW
Installation
Earth-lined pit
Earth
Beaten-earth surface
Installation
Earth-lined pit, along Wall 19 & N balk at Loca 8
Earth
Beaten-earth surface under L 18
Installation
Earth-lined pit at juncture of N & W balks
Earth
Pit fill under Surf 23
Earth
Fill in poss water Channel 33
Earth
Exposure surface in NE
Installation
Garbage pit & fill
Installation
Poss water channel
Installation
Earth-lines pit
Earth
Exposure surface under Surf 15
Installation
Poss rodent hole
Earth
Beaten-earth surface under Surf 36
Earth
Exposure surface under Pit 25
Earth
Exposure surface under Surfs 36 & 26
Installation
Earth-lined pit
Architecture
N-S wall in W
Earth
Compacted occupational debris
Architecture
Earlier phase of Wall 4
Architecture
E-W wall in N balk
Earth
Arbitrary 20 cm fill layer
Installation
Burial pit lining
Earth
Beaten-earth surface
Earth
Tumble between Wall 44 & W balk
Earth
Debris S of Wall 44
Earth
Beaten-earth surface
Installation
Plaster installation
Earth
Boulder tumble under L 49
Earth
Beaten-earth surface
Earth
Tumble W of Wall 44
Earth
Hard surface under L 49
Installation
FT for Wall 44
Architecture
N-S wall frag in E balk
Architecture
E-W wall frag in NE balk stub
Earth
Beaten-earth surface in S balk
Earth
Beaten-earth surfaceunder Wall 48, 20 cm down
Earth
Mudbrick enriched area in Surf 59
Earth
Occupational debris layer
Earth
Occupational debris layer E of wall 44
Earth
Poss FT 80 fill along E face of Wall 44B
Earth
Poss FT 80 fill along N part of the E face of Wall 44A
Earth
Poss FT 80 fill along E face of Wall 44
Earth
Poss FT 80 fill for S part of the E face of Wall 44A; equals 73
Earth
Occupational debris layer E of Wall 44
Earth
Occupational debris layer E of Wall 44
Earth
Rock tumble W of Wall 44
Installation
Plaster & stone grinding installation
Installation
Poss FT for E face of Wall 44
Architecture
Rocky occupational debris layer in S room of domestic building
Earth
Fill in SE room of domestic building
Earth
Occupational debris layer W of Wall 44
Earth
Cobblestone floor W of Wall 44
Installation
Cobble pavement; same os Surf 84
Architecture
E-W wall E of Wall 44
Earth
Beaten-earth surface running up to SW corner of Wall 44
Earth
Ash layer; see 7L08:87
Earth
Beaten-earth surface; see 7L08:86
Architecture
E-W mudbrick wall
Earth
Debris layer; reinterprets L 63
Installation
Debris layer