Earth
Pre-excavation sift debris
Architecture
N-S wall in E half
Architecture
E-W wall W of Wall 3
Earth
Blockage of a doorway with Wall 4
Architecture
N-S wall W of wall 3
Earth
Rock tumble & sub-topsoil E of Wall 3
Earth
Fill & tumble (center of square off N balk)
Architecture
E-W wall E of Wall 3
Earth
Sub-topsoil in NW corner
Installation
Stone-lined bin
Earth
Post-occupational debris in between Walls 3, 4 & 6
Earth
Poss surface between Walls 3, 4 & 6
Installation
Cobble threshold between Walls 3 & 18
Earth
Earth layer under plaster Surf 19
Earth
Beaten-earth surface