001
Earth
Pre-excavation sift debris
002
Earth
Topsoil
003
Architecture
N-S wall in E half
004
Architecture
E-W wall W of Wall 3
005
Earth
Blockage of a doorway with Wall 4
006
Architecture
N-S wall W of wall 3
007
Earth
Rock tumble & sub-topsoil E of Wall 3
008
Earth
Fill & tumble (center of square off N balk)
009
Architecture
E-W wall E of Wall 3
010
Earth
Sub-topsoil in NW corner
011
Installation
Stone-lined bin
012
Earth
Earth in Wall 6
013
Earth
Earth E of Wall 3
014
Earth
Post-occupational debris in between Walls 3, 4 & 6
015
Earth
Poss surface between Walls 3, 4 & 6
016
Earth
Earth E of Wall 3
017
Earth
Poss surface
018
Architecture
N-S wall
019
Earth
Plaster surface
020
Installation
Cobble threshold between Walls 3 & 18
021
Earth
Earth layer under plaster Surf 19
022
Earth
Earth layer
023
Earth
Beaten-earth surface
024
Architecture
E-W Wall