Earth
Topsoil, sift pile, & rock pile
Earth
Reddish earth layer
Earth
Hard earth layer in NE corner
Earth
Earth layer in SE corner
Earth
Earth layer covering most of square
Architecture
N-S Wall in NE corner
Earth
Earth layer along S balk
Earth
Earth layer between two possible walls to N & S
Earth
Surface associated with LIR1 pithoi
Earth
Destruction earth layer
Earth
Fill in FT 20 for Wall 9
Installation
Foundation Trench for Wall 9
Architecture
N-S wall S of Wall 31
Architecture
Wall in SE corner
Architecture
E-W wall; S wall of EIR1 House A
Architecture
Possible N-S wall
Earth
Accumulation debris in possible door of Wall 21
Architecture
E-W wall in S
Architecture
N-S wall; W wall of the alcove in EIR1 House A
Earth
Destruction layer W of Wall 37
Architecture
E-W wall; crosswall at S end of 7J89
Earth
Brick layer in NW corner bounded by Walls 27, 31 & 35
Architecture
N-S wall; =7K70:26
Installation
Line of flat stones
Earth
Layer E of Wall 25 & below Wall 37
Earth
Plaster floor; same as 7K70:042
Earth
Rocky fill at S end of E balk
Earth
Layer with rocky fill
Earth
Backfill from previous seasons
Earth
Rock barrier (wall) in NW
Earth
Beaten-earth & cobble surface & earth below
Earth
Triangular area of earth removal next to Surf 52
Installation
Poss platform
Architecture
Thickening of E-W Wall 27
Earth
Earth layer beneath poss Platform 54
Architecture
E-W wall between Walls 21 &7J78:13
Earth
Earth deposit below Wall 27
Earth
Earth deposit below Wall 21
Earth
No Locus; unassigned
Earth
Earth deposit near perimeter wall in NW corner
Earth
Earth debris at base of Wall 30
Earth
Earth debris between Wall 7J89:27 and the perimeter wall
Earth
Earth & pottery concentration
Earth
Earth layer; tumble; part of destruction debris
Earth
Earth layer; tumble; part of destruction debris
Earth
Earth layer; tumble; part of destruction debris
Earth
Earth layer; tumble; part of destruction debris
Earth
Earth layer; destruction debris in EIR1 House C
Earth
Earth layer; destruction debris in EIR1 House C
Earth
Earth layer; destruction debris in EIR1 House C
Installation
Grinding installation in situ next to Wall 31
Installation
Thin mud brick wall line near grinding installation 74
Installation
Ash concentration
Earth
Surface in the N room of EIR1 House C
Earth
destruction debris along N side of Wall 58
Architecture
N-S curtain wall
Earth
fill of foundation trench 87
Installation
foundation trench