Locus A.7J79.075

Installation · Thin mud brick wall line near grinding installation 74

General Information

Locus Type Installation
Supervisor S. Brown
Designation Thin mud brick wall line near grinding installation 74
Reason Thin, in-situ bricks
Top Separation
Bottom Separation
Start Date 21 Jul, 2008
End Date 28 Jul, 2008

Interpretation

Function Poss brick bench to use with Grinding Installation 74
Stratigraphy remarks Later than Wall 31
Balk
Phase
Stratum

Installation Description

Type

Certain:

Brick installation

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Hard

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Linear

Quality 1:

None

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

0.97

Greatest width in meters:

0.15

Smallest width in meters:

0.9

Greatest Height in meters:

0

Lowest Height in meters:

0.15

Orientation (degrees):

100

Remarks

Remarks:

Perpendicular to Wall 31 in a bench like construction, though very thin; perpendicular to Grinding Installation 74; may have served as a seat for the person doing the grinding

Levels

Location Top Level Bottom Level

Stratigraphy

Relationship Related to Related locus
Under Earth layer A7J79:067
Seals against Wall A7J79:031

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
28 Jul, 2008 08A60581 Final: 7K60 Ir2 house
16 Jul, 2008 08A79323 Progress
17 Jul, 2008 08A79348 Progress
18 Jul, 2008 08A79373 Progress
21 Jul, 2008 08A79402 Progress
22 Jul, 2008 08A79434 Progress
23 Jul, 2008 08A79469 Progress
23 Jul, 2008 08A79470 Progress
28 Jul, 2008 08A79575 Final: 7J79
28 Jul, 2008 08A79576 Final: 7J79 with Bldg A
28 Jul, 2008 08A79577 Final: 7J79 with Perimeter wall
28 Jul, 2008 08A79586 Final: 7J79 from SE
28 Jul, 2008 08A79588 Final: 7J79 from S
28 Jul, 2008 08A69587 Final: 7J69/7J79
28 Jul, 2008 08A69589 Final: 7J69/7J79-2
28 Jul, 2008 08A79578 Final: 7J79-2
25 Jun, 2010 10A79016 progress
28 Jun, 2010 10A79028 progress
29 Jun, 2010 10A79042 progress
05 Jul, 2010 10A79101 progress
16 Jul, 2010 10A79219 progress
21 Jul, 2010 10A79265 progress