Architecture
Ephemeral E-W stone wall
Earth
Early layer above plaster Surface 7
Earth
Earth layer in E half of square
Earth
Earth layer below Surface 7
Installation
Stone-lined drain
Earth
Earth fill in Drain 9
Earth
Earth in E Pithos 15
Installation
Pithos bottom in situ
Earth
Fill in west Pithos 17
Installation
In-situ pithos in N balk
Earth
Earth deposit around W Pithos 17
Earth
Water-sorted earth accumulation; = L 20
Earth
Earth layer under Drain 9
Earth
Earth layer above Surf 23
Earth
Exposure surface in W half
Earth
Soft earth layer E of Surf 23
Installation
Tabun, large
Earth
Plaster surface patch
Earth
Earth layer in Tabun 26
Earth
Earth locus near N balk, E side
Earth
Earth layer between Wall 11 & cobbles
Architecture
Pillar base (east)
Architecture
Pillar base (west)
Earth
Earth deposit above Cobble Surf 36
Earth
Earth around Tabun 26 to Wall 11
Earth
Beaten-earth surface in S part of the square
Earth
Earth in the E end of the N balk
Earth
Plaster surface N of Cobble Surf 36