Architecture · E-W wall from Wall 3 to Wall 5
chert Qualifier 1:
chert Qualifier 2:
chert Qualifier 3:
chert Percent:
0
Limestone Qualifier 1:
Hard
Limestone Qualifier 2:
Limesotne Qualifier 3:
Limestone Percent:
100
basalt Qualifier 1:
basalt Qualifier 2:
basalt Qualifier 3:
basalt Percent:
0
nari Qualifier 1:
nari Qualifier 2:
nari Qualifier 3:
nari Percent:
0
mudbrick Qualifier 1:
mudbrick Qualifier 2:
mudbrick Qualifier 3:
mudbrick Percent:
Arch Frags:
0
Fragment Type:
Quarry:
Cobble (6-25 cm) %:
0
Small Boulder (25-50cm) %:
Medium Boulder (50-75cm) %:
0
Large Boulder (75-100cm) %:
0
Very Large Boulder (>1 m) %:
0
Pebble (.2-6 cm) %:
0
Cobble (6-25 cm) %:
0
Cobble (6-25 cm) %:
0
Small Boulder (25-50cm) %:
0
Medium Boulder (50-75cm) %:
0
Large Boulder (75-100cm) %:
0
Very Large Boulder (>1 m) %:
0
Length (upper):
0.0
Length (lower):
0.0
Width (upper):
0.0
Width (lower):
0.0
Depth (upper):
0.0
Depth (lower):
0.0
Unhewn %:
100
Semi-hewn %:
Dressed %:
0
Ashlar %:
0
Bossed %:
0
Upper Width:
0.0
Lower Width:
0.0
Upper Length:
0.0
Lower Length:
0.0
Sketch:
false
Photo:
false
Dry-laid %:
100
Clay %:
0
Mud %:
0
Cement %:
0
Plaster %:
0
Average Thickness:
0.0
Facing:
Unfaced
Color:
Style:
Boulder & Chink
Support:
Free-standing
Tendencies:
Highest Count:
0
Lowest Count:
3
Random:
false
Highest Count:
0
Lowest Count:
2
Two with Rubble:
Random:
false
Greatest Length in meters:
2
Greatest width in meters:
0.9
Smallest width in meters:
0.75
Greatest Height in meters:
0
Lowest Height in meters:
0
Orientation (degrees):
285
Dip (degrees):
0
Preservation:
Partial Superstructure: Little
Lean Direction (degrees):
0
Lean Degrees:
0
Top Foundation Level:
Remarks:
Top courses are tumbled
| Location | Top Level | Bottom Level |
|---|---|---|
| 25 | 912.77 | 0 |
| 26 | 912.2 | 912.03 |
| Relationship | Related to | Related locus |
|---|---|---|
| Under | Earth layer | B8K02:002 |
| Abuts | Wall | B8K02:003 |
| Abuts | Wall | B8K02:005 |
| Bonded to | Wall | B8K02:013 |
| Number | Date | Baskets | Total | Diagnostic | Published | ||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 84 | 25 July, 1996 | 17 | 91 | 11 | 2 | ||||||||||||||||||||||||||||||||||||
Pottery Readings
|
|||||||||||||||||||||||||||||||||||||||||
| 85 | 25 July, 1996 | 27 | 69 | 5 | 4 | ||||||||||||||||||||||||||||||||||||
Pottery Readings
|
|||||||||||||||||||||||||||||||||||||||||
| Date | Photo Number | Subject | Photo |
|---|---|---|---|
| 16 July, 1996 | 96B02208 | Progress |
|
| 19 July, 1996 | 96B02213 | Progress |
|
| 15 July, 1996 | 96B02207 | Progress |
|
| 18 July, 1996 | 96B02212 | Progress |
|
| 3 July, 1996 | 96B02200 | Progress |
|
| 2 July, 1996 | 96B02199 | 7K90 Surfaces |
|
| 4 July, 1996 | 96B02201 | Progress |
|
| 5 July, 1996 | 96B02202 | Progress |
|
| 8 July, 1996 | 96B02203 | Progress |
|
| 9 July, 1996 | 96B02204 | Progress |
|
| 10 July, 1996 | 96B02205 | Progress |
|
| 11 July, 1996 | 96B02206 | Progress |
|