Earth
Sift debris from previous seasons
Architecture
N-S wall; W wall of room with quoin & pier wall
Architecture
E-W wall from Wall 3 to Wall 5
Architecture
N-S Wall line; Walls 4 & 6 abut
Architecture
E-W wall abutting Wall 5 to E
Earth
Fill below sub-topsoil
Earth
Hard-packed earth layer
Earth
Fill/destruction enclosed by Walls 3 & 4
Earth
Fill/destruction between walls 5 & 6
Earth
Beaten-earth surface
Earth
Debris layer under Surf 11
Architecture
Single row of stones on W side of Wall 5
Architecture
E-W wall in E balk
Earth
Beaten-earth surface under Quoin & Pier 33
Earth
Brick & rock tumble in N; mud brick & rock tumble in N. of squere
Installation
Pit dug into L 17 to hold pithos
Earth
Beaten-earth surface
Earth
Earther under quoin
Installation
FT for Wall 5
Earth
Layer under Surf 16
Installation
FT around Wall 28
Architecture
N-S wall under W 3; E wall of LB building
Earth
Fill dirt between Walls 28 & 29
Earth
Refuse pit fill ; continues from 7K92 to the S
Architecture
Wall in NE; continues Wall 28 to N
Architecture
Quoin and pier wall in E balk
Earth
Fill between 2 rows of stones in Wall 28
Earth
Beaten-earth surface of hard reddish & white material
Architecture
N-S Quoin & Pier wall
Architecture
N-S Quoin & Pier wall
Earth
Beaten-earth surface
Earth
Rubbly destruction layer
Installation
Foundation trench for Wall 36
Architecture
Stairs leading up to S
Earth
Earth deposit around E Walls 46 & 47