Locus Type:
Installation
Supervisor:
E. Matthews
Designation:
Pit installation dug to house southern pithos
Reason:
To obtain dirt around southern pithos
Top Separation:
Very Clear
Bottom Separation:
Start Date:
03 Aug, 2012
End Date:
03 Aug, 2012
Function:
Stratigraphy remarks:
Balk:
Phase:
Stratum :
Certain:
Pit
Probable:
Possible 1:
Possible 2:
Limestone Qualifier 1:
Limestone Qualifier 2:
Limestone Percent:
Bedrock Qualifier 1:
Bedrock Qualifier 2:
Bedrock Percent:
Ceramic Qualifier 1:
Ceramic Qualifier 2:
Ceramic Percent:
Mud Qualifier 1:
Mud Qualifier 2:
Mud Percent:
Mudbrick Qualifier 1:
Mudbrick Qualifier 2:
Mudbrick Percent:
Nari Qualifier 1:
Nari Qualifier 2:
Nari Percent:
Plaster Qualifier 1:
Plaster Qualifier 2:
Plaster Percent:
Earth Qualifier 1:
Earth Qualifier 2:
Earth Percent:
100
Stone Qualifier 1:
Stone Qualifier 2:
Stone Percent:
Type:
Circular
Quality 1:
Quality 2:
Remarks:
Lining:
Greatest Length in meters:
0.65
Greatest width in meters:
0.35
Smallest width in meters:
0.3
Greatest Height in meters:
0.79
Lowest Height in meters:
Orientation (degrees):
Remarks:
| Location | Top Level | Bottom Level |
|---|---|---|
| 31 | 911.61 | 910.66 |
| Under | Earth layer | L6K98:033 |
| Cuts | Earth layer | L6K98:035 |
| Cuts | Earth layer | L6K98:037 |
| Number | Date | Baskets | Total | Diagnostic | Published | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 127 | 03 Aug, 2012 | 7 | |||||||||||||||
Pottery Readings
|
|||||||||||||||||