Locus L.6K89.030

Installation · Pit

General Information

Locus Type Installation
Supervisor R. Kent
Designation Pit
Reason Pit lines in W balk
Top Separation Unclear
Bottom Separation Average
Start Date 12 July, 2004
End Date 15 July, 2004

Interpretation

Function Pit cut from Hel level
Stratigraphy remarks Later than loci it cuts
Balk
Phase
Stratum

Installation Description

Type

Certain:

Probable:

Pit

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

None

Earth Qualifier 2:

Earth Percent:

100

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Irregular

Quality 1:

None

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1.15

Greatest width in meters:

0

Smallest width in meters:

0.67

Greatest Height in meters:

0

Lowest Height in meters:

0.39

Orientation (degrees):

0

Remarks

Remarks:

Identified when balk was trimmed; not certain where top was; at bottom was mass of unfired pottery frags; sim sherds were found above; must have cut other loci above; may have originated in loci excavated last season

Levels

Location Top Level Bottom Level
25 0 910.03
26 910.45 910.06

Stratigraphy

Relationship Related to Related locus
Over Earth layer L6K89:027
Cuts Earth layer L6K89:024
Cuts Earth layer L6K89:025
Cuts Surface L6K89:026
Cuts Earth layer L6K89:027
Fill Loci Earth layer L6K89:028

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
20 July, 2004 04L89219 Progress
14 July, 2004 04L89170 Progress
16 July, 2004 04L89195 Progress
19 July, 2004 04L89206 Progress