Umayri
Home
All digs
Sign in
Search loci
Home
Sign in
Search loci
Home
/
Area J
/
Square 6K26
/
Locus 005
Locus J.6K26.005
Earth · Bedrock
General Information
Locus Type
Earth
Supervisor
R. Dorsett
Designation
Bedrock
Reason
—
Top Separation
Very Clear
Bottom Separation
—
Start Date
17 July, 2014
End Date
24 July, 2014
Interpretation
Function
—
Stratigraphy remarks
As it appeared in 6k26, locus 5 (bedrock) was separated by a break that included a n-s seam between the two portions of exposed bedrock. Locus 005 (bedrock) was under earth locus 4 which was itself under locus 003 (wall).
Balk
—
Phase
—
Stratum
—
Levels
Location
Top Level
Bottom Level
0
903.8
0
0
903.6
0
0
903.25
0
0
903.45
0
0
903.23
0
Photos
Date
Photo Number
Subject
Photo
30 July, 2014
14J26234
FINAL
30 July, 2014
14J26235
FINAL
×