Locus H.7K31.003

General Information

Locus Type:

Installation

Supervisor:

D. Holloway

Designation:

Plaster surface

Reason:

A section of plaster over cobbles

Top Separation:

Clear

Bottom Separation:

Average

Start Date:

05 Jul, 1994

End Date:

12 Jul, 2002

Interpretation

Function:

Plaster surf frag S of Wall 2

Stratigraphy remarks:

Earlier than Wall 2

Balk:

E

Phase:

Stratum :

Installation Description

Type

Certain:

Surface

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

None

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Curvilinear

Quality 1:

Quality 2:

Remarks:

Mostly robbed

Lining

Lining:

None

Measurements

Greatest Length in meters:

0.7

Greatest width in meters:

0.15

Smallest width in meters:

0.45

Greatest Height in meters:

0.03

Lowest Height in meters:

0.08

Orientation (degrees):

114

Remarks

Remarks:

One section was still attached to the underside of a boulder 50 x 40 cm but the boulder was lying on a steep angle having been moved from original position

Levels

Location Top Level Bottom Level
29 912.68 0
30 912.86 912.81
35 912.78 0

Stratigraphy

Under Earth layer H7K31:001
Over Surface H7K31:004
Over Surface H7K31:017
Cut by FT H7K31:027
Over Earth layer H7K31:014
Over Earth layer H7K31:018

Pails

Number Date Baskets Total Diagnostic Published
96 09 Jul, 2002 7 0 0 0

Photos

Date Photo Number Subject Photo
11 Jul, 1994 94H31230 Progress
12 Jul, 1994 94H31248 Progress
13 Jul, 1994 94H31275 Progress
14 Jul, 1994 94H31291 Progress
18 Jul, 1994 94H31321 Progress
18 Jul, 1994 94H31334 Progress
20 Jul, 1994 94H31347 Progress
21 Jul, 1994 94H31360 Progress
22 Jul, 1994 94H31384 Progress
25 Jul, 1994 94H31397 Progress
15 Jul, 1994 94H31304 Progress
05 Jul, 1994 94H31178 Progress
06 Jul, 1994 94H31201 Progress
07 Jul, 1994 94H31213 Progress
27 Jul, 1994 94H31415 Final from S
21 Jun, 2002 02H31005 Pre-excavation
10 Jul, 2002 02H31151 Progress