Locus H.7K22.025

Installation · FT for Wall 3A

General Information

Locus Type Installation
Supervisor R. Dorsett
Designation FT for Wall 3A
Reason Clear break in the plaster as it approached Wall 3A
Top Separation Clear
Bottom Separation Clear
Start Date 1 July, 2002
End Date 15 July, 2002

Interpretation

Function FT for Wall 3A
Stratigraphy remarks Dug slightly before Wall 3A
Balk
Phase
Stratum

Installation Description

Type

Certain:

Foundation trench

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

None

Earth Qualifier 2:

Earth Percent:

100

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Linear

Quality 1:

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

3.75

Greatest width in meters:

0

Smallest width in meters:

0.48

Greatest Height in meters:

0

Lowest Height in meters:

0.33

Orientation (degrees):

0

Remarks

Remarks:

Levels

Location Top Level Bottom Level
25 912.86 912.54
28 912.96 912.63

Stratigraphy

Relationship Related to Related locus
Over Wall H7K22:036
Under Earth layer H7K22:009
Over Surface H7K22:014
Cuts Surface H7K22:010
Cuts Earth layer H7K22:017
Cuts Earth layer H7K22:018
Cuts Earth layer H7K22:019

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
2 July, 2002 02H22074 Progress
3 July, 2002 02H22086 Progress
8 July, 2002 02H22125 Cobbles 14 from E
15 July, 2002 02H22189 Progress