Installation · Plaster mixing basin
Certain:
Plaster mixing basin
Probable:
Possible 1:
Possible 2:
Limestone Qualifier 1:
Limestone Qualifier 2:
Limestone Percent:
0
Bedrock Qualifier 1:
Bedrock Qualifier 2:
Bedrock Percent:
0
Ceramic Qualifier 1:
Ceramic Qualifier 2:
Ceramic Percent:
0
Mud Qualifier 1:
Mud Qualifier 2:
Mud Percent:
Mudbrick Qualifier 1:
Mudbrick Qualifier 2:
Mudbrick Percent:
Nari Qualifier 1:
Nari Qualifier 2:
Nari Percent:
0
Plaster Qualifier 1:
Hard
Plaster Qualifier 2:
Plaster Percent:
0
Earth Qualifier 1:
Earth Qualifier 2:
Earth Percent:
0
Stone Qualifier 1:
Stone Qualifier 2:
Stone Percent:
0
Type:
Oval
Quality 1:
Nearly
Quality 2:
Remarks:
Lining:
Plaster
Greatest Length in meters:
0.8
Greatest width in meters:
0.65
Smallest width in meters:
0.6
Greatest Height in meters:
0.25
Lowest Height in meters:
0.2
Orientation (degrees):
0
Remarks:
A series of small (5-12 cm) cobbles appeared laid upon small Cobbles 14 as support for this basin; top level at 22 is top edge of the basin; bottom level is at the bottom of the basin bowl
Additional descriptions recorded later as the locus was further excavated.
| Location | Top Level | Bottom Level |
|---|---|---|
| 22 | 912.86 | 912.63 |
| Relationship | Related to | Related locus |
|---|---|---|
| Under | Earth layer | H7K22:024 |
| Over | Surface | H7K22:014 |
| Under | Surface | H7K22:010 |
| Cuts | Earth layer | H7K22:017 |
| Cuts | Earth layer | H7K22:018 |
| Cuts | Earth layer | H7K22:019 |
| Number | Date | Baskets | Total | Diagnostic | Published |
|---|
| Date | Photo Number | Subject | Photo |
|---|---|---|---|
| 1 July, 2002 | 02H22062 | Progress |
|
| 2 July, 2002 | 02H22074 | Progress |
|
| 3 July, 2002 | 02H22086 | Progress |
|
| 11 July, 2002 | 02H22161 | Progress |
|
| 9 July, 2002 | 02H22137 | Progress |
|
| 1 July, 2002 | 02H22066 | Plaster mixing basin |
|
| 3 July, 2002 | 02H22091 | Plaster mixing basin |
|
| 2 July, 2002 | 02H22079 | Plaster mixing basin |
|
| 2 July, 2002 | 02H22078 | Plaster mixing basin, contents |
|