Locus H.7K22.016

Installation · Pit for Pithos 8

General Information

Locus Type Installation
Supervisor R. Dorsett
Designation Pit for Pithos 8
Reason Surfaces cut for pithos installation
Top Separation Clear
Bottom Separation Average
Start Date 28 June, 1996
End Date 11 July, 2002

Interpretation

Function Pit for Pithos 8
Stratigraphy remarks Cuts earlier surfaces
Balk
Phase
Stratum

Installation Description

Type

Certain:

Pit

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

None

Earth Qualifier 2:

Earth Percent:

100

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Circular

Quality 1:

None

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

0.75

Greatest width in meters:

0

Smallest width in meters:

0

Greatest Height in meters:

0

Lowest Height in meters:

0.85

Orientation (degrees):

0

Remarks

Remarks:

No pottery; not excavated inb U02, so no earth supp

Levels

Location Top Level Bottom Level
15 913.06 912.21
21 912.84 912.57

Stratigraphy

Relationship Related to Related locus
Under Earth layer H7K22:009
Cuts Surface H7K22:010
Fill Loci Installation H7K22:008
Cuts Earth layer H7K22:017
Cuts Earth layer H7K22:018
Cuts Surface H7K22:014
Cuts Earth layer H7K22:019
Over Earth layer H7K22:020

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
21 June, 2002 02H22004 Progress
23 June, 2002 02H22014 Progress
25 June, 2002 02H22015 Progress
26 June, 2002 02H22029 Progress
28 June, 2002 02H22052 Progress
1 July, 2002 02H22062 Progress
2 July, 2002 02H22074 Progress
3 July, 2002 02H22086 Progress
5 July, 2002 02H22110 Progress
8 July, 2002 02H22125 Cobbles 14 from E
10 July, 2002 02H22150 Progress
11 July, 2002 02H22161 Progress
8 July, 2002 02H22126 Cobbles 14 from S
9 July, 2002 02H22137 Progress
27 June, 2002 02H22041 Progress
5 July, 2002 02H22111 Progress