Locus H.7K21.099

Installation · Door socket in line with Wall 91

General Information

Locus Type Installation
Supervisor C. Wang
Designation Door socket in line with Wall 91
Reason socket worn in stone
Top Separation Clear
Bottom Separation
Start Date 21 July, 2010
End Date 27 July, 2010

Interpretation

Function
Stratigraphy remarks
Balk E
Phase
Stratum

Installation Description

Type

Certain:

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

None

Limestone Qualifier 2:

Limestone Percent:

100

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

Plan

Type:

Circular

Quality 1:

Quality 2:

Remarks:

actual stone ovalish

Lining

Lining:

Measurements

Greatest Length in meters:

0.55

Greatest width in meters:

Smallest width in meters:

Greatest Height in meters:

Lowest Height in meters:

Orientation (degrees):

Remarks

Remarks:

socket itself is 0.19 m in diameter

Levels

Location Top Level Bottom Level
30 912.26 0

Stratigraphy

Relationship Related to Related locus
Under Earth layer H7K21:088
Abuts Wall H7K21:091
Abutted by Wall H7K21:094

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
28 July, 2010 10H21335 Final
28 July, 2010 10H21334 Final
28 July, 2010 10H21336 Final
19 July, 2010 10H21229 Progress
22 July, 2010 10H21278 Progress
23 July, 2010 10H21295 Progress
26 July, 2010 10H21308 Progress
27 July, 2010 10H21321 Progress
19 July, 2010 10H21228 E Balk Progress
20 July, 2010 10H21245 E Balk Progress
21 July, 2010 10H21262 E Balk Progress