Locus H.7K21.034

General Information

Locus Type:

Installation

Supervisor:

D. Holloway

Designation:

Pit in E balk

Reason:

Cuts plaster; color different

Top Separation:

Clear

Bottom Separation:

Clear

Start Date:

10 Jul, 2002

End Date:

10 Jul, 2002

Interpretation

Function:

Pit through upper plaster surfaces

Stratigraphy remarks:

Cuts upper plaster surfaces; post-dates plaster surfaces

Balk:

E

Phase:

Stratum :

Installation Description

Type

Certain:

Probable:

Pit

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Hard

Earth Qualifier 2:

Earth Percent:

100

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Irregular

Quality 1:

None

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

2.35

Greatest width in meters:

0

Smallest width in meters:

1.15

Greatest Height in meters:

0.38

Lowest Height in meters:

0.15

Orientation (degrees):

0

Remarks

Remarks:

Extends from 7K22 into E balk; complete depth is visible on W side of balk stub

Levels

Location Top Level Bottom Level
18 912.82 912.23

Stratigraphy

Over Surface H7K21:032
Equals Pit H7K22:011
Cuts Surface H7K21:004
Cuts Surface H7K21:007
Cuts Surface H7K21:022
Cuts Surface H7K21:028
Cuts Surface H7K21:029
Fill Loci Earth layer H7K21:035

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
15 Jul, 2002 02H21190 Progress
16 Jul, 2002 02H21197 Progress
12 Jul, 2002 02H21182 E balk
17 Jul, 2002 02H21211 Progress
12 Jul, 2002 02H21076 E balk from S