Installation · Interseasonal pitting
Certain:
Pit
Probable:
Possible 1:
Possible 2:
Limestone Qualifier 1:
Limestone Qualifier 2:
Limestone Percent:
0
Bedrock Qualifier 1:
Bedrock Qualifier 2:
Bedrock Percent:
0
Ceramic Qualifier 1:
Ceramic Qualifier 2:
Ceramic Percent:
0
Mud Qualifier 1:
Mud Qualifier 2:
Mud Percent:
Mudbrick Qualifier 1:
Mudbrick Qualifier 2:
Mudbrick Percent:
Nari Qualifier 1:
Nari Qualifier 2:
Nari Percent:
0
Plaster Qualifier 1:
Plaster Qualifier 2:
Plaster Percent:
0
Earth Qualifier 1:
None
Earth Qualifier 2:
Earth Percent:
100
Stone Qualifier 1:
Stone Qualifier 2:
Stone Percent:
0
Type:
Triangular
Quality 1:
Rounded
Quality 2:
Remarks:
Lining:
None
Greatest Length in meters:
1
Greatest width in meters:
0
Smallest width in meters:
0.51
Greatest Height in meters:
0
Lowest Height in meters:
0.33
Orientation (degrees):
0
Remarks:
No fill except cement used for consolidating walls at the end of U98
| Location | Top Level | Bottom Level |
|---|---|---|
| 15 | 912.36 | 912.19 |
| Relationship | Related to | Related locus |
|---|---|---|
| Over | Surface | H7K21:024 |
| Cuts | Surface | H7K21:007 |
| Cuts | Surface | H7K21:013 |
| Cuts | Surface | H7K21:020 |
| Cuts | Surface | H7K21:021 |
| Cuts | Surface | H7K21:022 |
| Number | Date | Baskets | Total | Diagnostic | Published |
|---|
| Date | Photo Number | Subject | Photo |
|---|---|---|---|
| 26 June, 2000 | 00H21017 | Pre-excavation |
|
| 28 June, 2000 | 00H21049 | FT in balk |
|
| 28 June, 2000 | 00H21066 | Progress |
|
| 3 July, 2000 | 00H21107 | Progress |
|
| 4 July, 2000 | 00H21123 | Progress |
|
| 5 July, 2000 | 00H21141 | Progress |
|
| 28 June, 2000 | 00H21048 | Progress |
|
| 27 June, 2000 | 00H21029 | Progress |
|
| 29 June, 2000 | 00H21085 | Progress |
|