Locus H.7K12.026

General Information

Locus Type:

Installation

Supervisor:

J. Williams

Designation:

FT for Wall 21

Reason:

Change in architecture of Walls 21 & 25

Top Separation:

Average

Bottom Separation:

Clear

Start Date:

31 Jul, 1998

End Date:

31 Jul, 1998

Interpretation

Function:

Dug to build Wall 21 which seems to extend into 7K02

Stratigraphy remarks:

Cuts into L 3 & is thus FT for a late wall; contemp with Walls 5 & 9

Balk:

Phase:

Stratum :

Installation Description

Type

Certain:

Probable:

Possible 1:

Foundation trench

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

None

Earth Qualifier 2:

Earth Percent:

100

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Linear

Quality 1:

None

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1

Greatest width in meters:

0.79

Smallest width in meters:

0.6

Greatest Height in meters:

0

Lowest Height in meters:

0

Orientation (degrees):

21

Remarks

Remarks:

Was removed with L 3 so plan is only inferred from Walls 21 & 25; fill was excavated with L 3; measurements are taken from Walls 21 & 25

Levels

Location Top Level Bottom Level
33 913.02 0

Stratigraphy

Under Wall H7K12:021
Over Wall H7K12:025
Cuts Earth layer H7K12:003
Cuts Wall H7K12:025

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
05 Aug, 1998 98H12486 Final