Locus Type:
Installation
Supervisor:
J. Williams
Designation:
FT for Wall 5
Reason:
Visible trench line
Top Separation:
Very Unclear
Bottom Separation:
Clear
Start Date:
29 Jul, 1998
End Date:
31 Jul, 1998
Function:
FT for Wall 5
Stratigraphy remarks:
Cut into Wall 11 & L 9
Balk:
Phase:
Stratum :
Certain:
Foundation trench
Probable:
Possible 1:
Possible 2:
Limestone Qualifier 1:
Limestone Qualifier 2:
Limestone Percent:
0
Bedrock Qualifier 1:
Bedrock Qualifier 2:
Bedrock Percent:
0
Ceramic Qualifier 1:
Ceramic Qualifier 2:
Ceramic Percent:
0
Mud Qualifier 1:
Mud Qualifier 2:
Mud Percent:
Mudbrick Qualifier 1:
Mudbrick Qualifier 2:
Mudbrick Percent:
Nari Qualifier 1:
Nari Qualifier 2:
Nari Percent:
0
Plaster Qualifier 1:
Plaster Qualifier 2:
Plaster Percent:
0
Earth Qualifier 1:
None
Earth Qualifier 2:
Earth Percent:
0
Stone Qualifier 1:
Stone Qualifier 2:
Stone Percent:
0
Type:
Linear
Quality 1:
Nearly
Quality 2:
Remarks:
Along Wall 5
Lining:
None
Greatest Length in meters:
4.78
Greatest width in meters:
0.25
Smallest width in meters:
0.05
Greatest Height in meters:
0
Lowest Height in meters:
0.77
Orientation (degrees):
25
Remarks:
Evidence for pitting was found in the balk
| Location | Top Level | Bottom Level |
|---|---|---|
| 5 | 913.28 | 912.51 |
| Under | Earth layer | H7K12:017 |
| Under | Wall | H7K12:005 |
| Over | Earth layer | H7K12:009 |
| Cuts | Wall | H7K12:011 |
| Cuts | Earth layer | H7K12:009 |
| Cuts | Wall | H7K12:004 |
| Fill Loci | Earth layer | H7K12:017 |
| Number | Date | Baskets | Total | Diagnostic | Published |
|---|