Locus H.7K11.030

Installation · Pit in W balk

General Information

Locus Type Installation
Supervisor D. Mook
Designation Pit in W balk
Reason Visible in balk with 7K12
Top Separation Unclear
Bottom Separation Average
Start Date 7 July, 2004
End Date 14 July, 2004

Interpretation

Function Pit in W balk; function unknown
Stratigraphy remarks later than L 31
Balk
Phase
Stratum

Installation Description

Type

Certain:

Pit

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

None

Earth Qualifier 2:

Earth Percent:

100

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Rectangular

Quality 1:

Rounded

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1.64

Greatest width in meters:

1.08

Smallest width in meters:

0.32

Greatest Height in meters:

0.32

Lowest Height in meters:

0.12

Orientation (degrees):

0

Remarks

Remarks:

Supplements

Additional descriptions recorded later as the locus was further excavated.

Supplement 1

Levels

Location Top Level Bottom Level
5 912.68 912.56
5 912.66 912.42
11 912.72 912.41
11 912.75 912.51
12 912.74 912.43
17 912.78 912.63
17 912.75 912.43

Stratigraphy

Relationship Related to Related locus
Under Earth layer H7K11:002
Under Earth layer H7K11:029
Cuts Earth layer H7K11:031
Fill Loci Earth layer H7K11:029

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
7 July, 2004 04H11106 Progress
8 July, 2004 04H11119 Progress
9 July, 2004 04H11132 Progress
12 July, 2004 04H11146 Progress