Locus H.7K10.028

Earth · earth locus under locus 25

General Information

Locus Type Earth
Supervisor R.Gray
Designation earth locus under locus 25
Reason color change from 25
Top Separation Very Clear
Bottom Separation —
Start Date 19 July, 2012
End Date 19 July, 2012

Interpretation

Function —
Stratigraphy remarks —
Balk —
Phase —
Stratum —

Earth Description

Color

Munsell Number:

Texture

Texture:

Particle Shape A %:

Particle Shape AS %:

Particle Shape SR %:

Particle Shape R %:

Consistence

Hardness:

Compactness Description 1:

Compactness Degree 1:

Compactness Description 2:

Compactness Degree 2:

Wetness Description:

Wetness Degree:

Structure:

Measurements

Length:

Width:

Upper Depth:

Lower Depth:

Downslope Direction:

Degree of Slope:

Surface Material

Surface Material:

Laminated Surface:

Stone Inclusions

Pebbles (2mm-6cm)/bskt:

Cobbles (6 - 25cm)/bskt:

Boulders (25 cm+)/bskt:

Stone Distribution:

Earth Inclusions

Nari Frequency (per m2):

Nari Size (in m):

Brick Frequency (per m2):

Brick Size (in m):

Pebble Frequency (per m2):

Pebble Size (in m):

Ash Frequency (per m2):

Ash Size (in m):

Earth Distribution:

Artifact Inclusions

Pottery Frequency:

Flint Frequency:

Glass Totals:

Tesserae Totals:

Tabun Fragments:

Brick Fragments:

Roof Tiles:

Worked Stones:

Burned Stones:

Unfired Clay:

Arch. Fragments:

Artifact Distribution:

Organic Inclusions

Bone Frequency:

Olive Pits per basket:

Burned Wood per basket:

Burnt Wood Avg Size in cm:

UD per basket:

UD SAvg Size in cm:

Distribution:

Remarks

Remarks:

Unexcavated in U12

Levels

Location Top Level Bottom Level
1 911.83 0

Stratigraphy

Relationship Related to Related locus
Under Earth layer h7k10:025
Seals against Surface h7k10:026
Seals against Wall 7K10:030

Photos

Date Photo Number Subject Photo
20 July, 2012 12H10129 PROGRESS
23 July, 2012 12H10140 PROGRESS
23 July, 2012 12H10141 PROGRESS
6 August, 2012 12H10342 FINAL