Locus F.7L08.045

Architecture · N-S wall in E balk

General Information

Locus Type Architecture
Supervisor D. Hopkins
Designation N-S wall in E balk
Reason Stones in a line
Top Separation Very Clear
Bottom Separation Very Clear
Start Date 3 July, 1989
End Date 4 August, 1989

Interpretation

Function Poor state of preservation of associated surfaces makes a determination of function problematic; prob constituted the external wall of a structure in 7L09; transverses entire E edge; preserved to a much greater length than the 7L09 wall; foundation stones not distinctively more massive than upper courses
Stratigraphy remarks Wall is sealed against by surfaces with LIR2 pottery & is later than the IR1 strata it was founded upon; no FT in 7L08; some accumulation of LIR2 in Surf 54 suggests founding at the beginning of LIR2 rather than late in EIR2; continues into N balk
Balk
Phase
Stratum

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

Hard

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

10

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

30

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

20

Cobble (6-25 cm) %:

80

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

80

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

0

Lowest Count:

3

Random:

false

Rows

Highest Count:

0

Lowest Count:

2

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

5

Greatest width in meters:

0.96

Smallest width in meters:

0.92

Greatest Height in meters:

1.2

Lowest Height in meters:

0.6

Orientation (degrees):

10

Dip (degrees):

6

Preservation

Preservation:

Partial Superstructure: Little

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

0.0

Remarks

Remarks:

Levels

Location Top Level Bottom Level
18 907.41 0
23 907.71 906.62
24 907.71 0
29 907.57 906.6
30 907.54 0
35 907.71 0
36 907.71 906.67

Stratigraphy

Relationship Related to Related locus
Over Surface F7L08:054
Over Earth layer F7L08:052
Over Earth layer F7L08:055
Over Surface F7L08:056
Sealed agnst by Earth layer F7L08:044
Sealed agnst by Surface F7L08:046
Sealed agnst by Surface F7L08:048

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
30 June, 1989 89F08479 Progress
1 July, 1989 89F08480 Progress
5 July, 1989 89F08481 Progress
6 July, 1989 89F08483 Progress
7 July, 1989 89F08484 Progress
10 July, 1989 89F08485 Progress
11 July, 1989 89F08486 Progress
13 July, 1989 89F08488 Progress
14 July, 1989 89F08489 Progress
20 July, 1989 89F08492 Progress
24 July, 1989 89F08493 Progress
25 July, 1989 89F08494 Progress
26 July, 1989 89F08495 Progress
27 July, 1989 89F08496 Progress
28 July, 1989 89F08497 Progress
31 July, 1989 89F08498 Progress
1 August, 1989 89F08499 Progress
2 August, 1989 89F08500 Progress
28 June, 1989 89F08477 Pre-excavation
29 June, 1989 89F08478 Progress
12 July, 1989 89F08487 Progress
18 July, 1989 89F08490 Progress
19 July, 1989 89F08491 Progress
3 August, 1989 89F08501 Progress
4 August, 1989 89F08502 Final from N
4 August, 1989 89F08503 Final from S
23 June, 1992 92F08351 Cleanup
24 June, 1992 92F08352 Progress
25 June, 1992 92F08353 Progress
26 June, 1992 92F08354 Progress
29 June, 1992 92F08355 Progress
30 June, 1992 92F08356 Progress
3 July, 1992 92F08359 Progress
6 July, 1992 92F08361 Progress
7 July, 1992 92F08362 Progress
9 July, 1992 92F08363 Progress
10 July, 1992 92F08364 Progress
11 July, 1992 92F08365 Progress
14 July, 1992 92F08366 Progress
15 July, 2009 92F08367 Progress
16 July, 1992 92F08368 Progress