Earth · Occupational debris layer
Munsell Number:
10YR 5/3
Texture:
Loam-Silt loam
Particle Shape A %:
20
Particle Shape AS %:
45
Particle Shape SR %:
25
Particle Shape R %:
10
Hardness:
Very Loose
Compactness Description 1:
Crumbly
Compactness Degree 1:
moderately
Compactness Description 2:
Compactness Degree 2:
Wetness Description:
Dry
Wetness Degree:
somewhat
Structure:
Random
Length:
2.55
Width:
2
Upper Depth:
0
Lower Depth:
1.05
Downslope Direction:
63
Degree of Slope:
3
Surface Material:
Laminated Surface:
0
Pebbles (2mm-6cm)/bskt:
475
Cobbles (6 - 25cm)/bskt:
20
Boulders (25 cm+)/bskt:
0
Stone Distribution:
Random
Nari Frequency (per m2):
0
Nari Size (in m):
0
Brick Frequency (per m2):
0
Brick Size (in m):
0
Pebble Frequency (per m2):
0
Pebble Size (in m):
0
Ash Frequency (per m2):
0
Ash Size (in m):
0
Earth Distribution:
Pottery Frequency:
Flint Frequency:
Glass Totals:
0
Tesserae Totals:
0
Tabun Fragments:
0
Brick Fragments:
0
Roof Tiles:
0
Worked Stones:
0
Burned Stones:
Unfired Clay:
Arch. Fragments:
Artifact Distribution:
Bone Frequency:
Olive Pits per basket:
0
Burned Wood per basket:
0
Burnt Wood Avg Size in cm:
UD per basket:
0
UD SAvg Size in cm:
0
Distribution:
Remarks:
| Location | Top Level | Bottom Level |
|---|---|---|
| 13 | 868.05 | 0 |
| Relationship | Related to | Related locus |
|---|---|---|
| Under | Earth layer | E0002:005 |
| Contiguous to | Earth layer | E0002:014 |
| Contiguous to | Earth layer | E0002:017 |
| Cut by | Wall | E0002:009 |
| Over | Earth layer | E0002:015 |
| Number | Date | Baskets | Total | Diagnostic | Published | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 44 | 28 July, 1987 | 35 | 33 | 30 | 0 | ||||||||||||||||||
Pottery Readings
|
|||||||||||||||||||||||
| 45 | 28 July, 1987 | 80 | 31 | 28 | 0 | ||||||||||||||||||
Pottery Readings
|
|||||||||||||||||||||||
| Date | Photo Number | Subject | Photo |
|---|---|---|---|
| 24 July, 1987 | 87E02364 | Progress |
|
| 3 July, 1987 | 87E02376 | Surf 5 |
|
| 20 July, 1987 | 87E02360 | Progress |
|
| 21 July, 1987 | 87E02361 | Progress |
|
| 24 July, 1987 | 87E02365 | Final |
|
| 3 August, 1987 | 87E02371 | Progress |
|
| 3 August, 1987 | 87E02375 | Final |
|
| 27 July, 1987 | 87E02366 | Progress |
|