Locus E.0002.003

General Information

Locus Type:

Architecture

Supervisor:

B. Cole

Designation:

Upper course of W wall of well; plus mortar

Reason:

Analyze wall mortar

Top Separation:

Clear

Bottom Separation:

Clear

Start Date:

01 Jul, 1987

End Date:

03 Jul, 1987

Interpretation

Function:

To ensure that the concrete cap would be nearly level, the small stones from Wall 3A were placed on top of the larger boulders of Wall 3B

Stratigraphy remarks:

Because the concrete used to hold the stones is the same as in the well cap, the two loci date to the same time period, first half of 20th c

Balk:

Phase:

Stratum :

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

100

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

0

Cobble (6-25 cm) %:

0

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

100

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

0

Clay %:

0

Mud %:

0

Cement %:

100

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

0

Lowest Count:

2

Random:

false

Rows

Highest Count:

0

Lowest Count:

3

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

2.65

Greatest width in meters:

0

Smallest width in meters:

0

Greatest Height in meters:

0.2

Lowest Height in meters:

0.1

Orientation (degrees):

0

Dip (degrees):

0

Preservation

Preservation:

Complete

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

Remarks

Remarks:

Construction style: stones used were small, fitted tightly together and plastered.

Levels

Location Top Level Bottom Level
17 868.81 868.71
23 868.79 868.77
23 868.77 868.07
23 867.88 867.49
24 867.85 0
35 868.84 868.78

Stratigraphy

FT FT E0002:030
Abutted by Wall E0002:013
Sealed agnst by Earth layer E0002:015
Sealed agnst by Earth layer E0002:019
Bonded to Installation E0002:032
Under Installation E0002:002
Over Wall E0002:003
Sealed agnst by Surface E0002:001
Over Wall E0002:003
Over Wall E0002:003
Sealed agnst by Surface E0002:001
Sealed agnst by FT E0002:004
Under Wall E0002:003
Over Wall E0002:003
Under Wall E0002:003

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
17 Jul, 1989 89E02401 Progress
04 Aug, 1989 89E02414 Final
28 Jun, 1989 89E02386 Cleanup
28 Jun, 1989 89E02386 Cleanup
28 Jun, 1989 89E02386 Cleanup
04 Jul, 1989 89E02390 Progress
05 Jul, 1989 89E02391 Progress
06 Jul, 1989 89E02392 Progress
30 Jun, 1989 89E02388 Progress
03 Jul, 1989 89E02389 Progress
03 Jul, 1989 89E02389 Progress
10 Jul, 1989 89E02394 Progress
11 Jul, 1989 89E02395 Progress
11 Jul, 1989 89E02395 Progress
07 Jul, 1989 89E02393 Progress
08 Jul, 1987 87A70088 Progress
08 Jul, 1987 87A70088 Progress
01 Jul, 1987 87E02348 Progress
02 Jul, 1987 87E02349 Progress
03 Jul, 1987 87E02350 Progress
03 Aug, 1987 87E02373 Final
03 Aug, 1987 87E02373 Final
03 Aug, 1987 87E02373 Final
03 Aug, 1987 87E02373 Final
09 Jul, 1987 87E02354 Progress
09 Jul, 1987 87E02354 Progress
23 Jul, 1987 87E02363 Progress
23 Jul, 1987 87E02363 Progress
23 Jul, 1987 87E02363 Progress
13 Jul, 1987 87E02356 Progress
13 Jul, 1987 87E02356 Progress
03 Aug, 1987 87E02375 Final
03 Aug, 1987 87E02375 Final
03 Aug, 1987 87E02375 Final
03 Aug, 1987 87E02375 Final
28 Jul, 1987 87E02367 Progress
29 Jul, 1987 87E02368 Progress
29 Jul, 1987 87E02368 Progress
31 Jul, 1987 87E02370 Progress
31 Jul, 1987 87E02370 Progress
27 Jun, 1989 892E02001 Cleanup
30 Jul, 1987 87E02369 Progress
30 Jul, 1987 87E02369 Progress
30 Jul, 1987 87E02369 Progress
30 Jul, 1987 87E02369 Progress
18 Jul, 1989 89E02402 Progress
19 Jul, 1989 892D02018 Progress