Locus E.0001.002

Installation · Mod concrete well cap

General Information

Locus Type Installation
Supervisor C. Cherry
Designation Mod concrete well cap
Reason Cement
Top Separation Very Clear
Bottom Separation Very Clear
Start Date 30 June, 1987
End Date 17 July, 1987

Interpretation

Function Laid in place most likely during the early part of this century to seal off the spring
Stratigraphy remarks Formed over the top of stone Foundation 3
Balk
Phase
Stratum

Installation Description

Type

Certain:

Pavement

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Rectangular

Quality 1:

None

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

0.32

Greatest width in meters:

Smallest width in meters:

0.22

Greatest Height in meters:

0

Lowest Height in meters:

0.27

Orientation (degrees):

0

Remarks

Remarks:

Obviously a product of the first half of the 20th c; the concrete is poorly constructed with parts completely missing; rectangular with rounded edges

Levels

Location Top Level Bottom Level
11 869.1 868.83

Stratigraphy

Relationship Related to Related locus
Over Installation E0001:003
Sealed agnst by Surface E0001:001

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
6 July, 1987 87E01324 Progress
24 June, 1987 87E01318 Pre-excavation