Locus C.8L82.030

Installation · Bedrock

General Information

Locus Type Installation
Supervisor J. Battenfield
Designation Bedrock
Reason Bedrock appeared under Surf 26
Top Separation
Bottom Separation
Start Date 2 August, 1987
End Date 2 August, 1987

Interpretation

Function Bedrock served as a solid foundation for all depositional activity throughout the entire use history of the site
Stratigraphy remarks
Balk
Phase
Stratum

Installation Description

Type

Certain:

Bedrock

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

100

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Quality 1:

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

5

Greatest width in meters:

0

Smallest width in meters:

5

Greatest Height in meters:

0

Lowest Height in meters:

0

Orientation (degrees):

0

Remarks

Remarks:

Levels

Location Top Level Bottom Level
19 890.58 0

Stratigraphy

Relationship Related to Related locus
Under Surface C8L82:026
Under Wall C8L82:016
Under Earth layer C8L82:018
Under Surface C8L82:027
Cut by Wall C8L82:005

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
4 August, 1987 87A60038 Final/S balk
3 August, 1987 87C82314 Progress
4 August, 1987 87A60039 Final
4 August, 1987 87C82317 S balk