Locus C.8L63.009

Installation · Bedrock hollow (pit)

General Information

Locus Type Installation
Supervisor R. Merrill
Designation Bedrock hollow (pit)
Reason Bedrock is cut in an obviously man made configuration
Top Separation Very Clear
Bottom Separation Very Clear
Start Date 17 July, 1984
End Date 17 July, 1984

Interpretation

Function Poss storage bin
Stratigraphy remarks The pit-like structure is bedrock; filled by L 8
Balk
Phase
Stratum

Installation Description

Type

Certain:

Bedrock hollow

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

100

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Oval

Quality 1:

Nearly

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1.3

Greatest width in meters:

0.6

Smallest width in meters:

0.4

Greatest Height in meters:

0.6

Lowest Height in meters:

0.39

Orientation (degrees):

70

Remarks

Remarks:

Levels

Location Top Level Bottom Level
22 892.56 892.21
23 892.37 891.91

Stratigraphy

Relationship Related to Related locus
Under Earth layer C8L63:008
Over Bedrock C8L63:002

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
18 July, 1984 84C63300 Progress
19 July, 1984 84C63322 Progress
20 July, 1984 84C63340 Progress
23 July, 1984 84C63361 Progress
24 July, 1984 84C63386 Final
18 July, 1984 84C63301 Actual structure
24 July, 1984 8402-0828 Final
1 August, 1984 84C63549 Final