Locus B.8K12.004

General Information

Locus Type:

Installation

Supervisor:

J. Raab

Designation:

Poss silo or rock tumble

Reason:

Flat stones on edge in a partial circle

Top Separation:

Clear

Bottom Separation:

Clear

Start Date:

04 Jul, 2002

End Date:

11 Jul, 2002

Interpretation

Function:

Poss silo; or simply rock tumble in room

Stratigraphy remarks:

Within rock tumble in LIR2/Per room

Balk:

Phase:

Stratum :

Installation Description

Type

Certain:

Probable:

Possible 1:

Silo

Possible 2:

Material

Limestone Qualifier 1:

None

Limestone Qualifier 2:

Limestone Percent:

100

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Circular

Quality 1:

Nearly

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

0.78

Greatest width in meters:

0.93

Smallest width in meters:

0.6

Greatest Height in meters:

0.68

Lowest Height in meters:

0.55

Orientation (degrees):

0

Remarks

Remarks:

For transit readings the poss silo is fully contained in Loca 32; in making the transit readings 32a is the E side; 32b is the large circular stone on edge on the N side; 32c is the flat stone on the E side

Levels

Location Top Level Bottom Level
32 912.66 912.11
32 912.77 912.11
32 912.59 912.11

Stratigraphy

Under Earth layer B8K12:002
Over Earth layer B8K12:008

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
05 Jul, 2002 02B12103 Progress
08 Jul, 2002 02B12119 Progress
09 Jul, 2002 02B12132 Progress
10 Jul, 2002 02B12144 Progress
11 Jul, 2002 02B12155 Progress