Installation · Stone bench along Wall 9
Certain:
Probable:
Bench
Possible 1:
Possible 2:
Limestone Qualifier 1:
Hard
Limestone Qualifier 2:
Limestone Percent:
100
Bedrock Qualifier 1:
Bedrock Qualifier 2:
Bedrock Percent:
0
Ceramic Qualifier 1:
Ceramic Qualifier 2:
Ceramic Percent:
0
Mud Qualifier 1:
Mud Qualifier 2:
Mud Percent:
Mudbrick Qualifier 1:
Mudbrick Qualifier 2:
Mudbrick Percent:
Nari Qualifier 1:
Nari Qualifier 2:
Nari Percent:
0
Plaster Qualifier 1:
Plaster Qualifier 2:
Plaster Percent:
0
Earth Qualifier 1:
Earth Qualifier 2:
Earth Percent:
0
Stone Qualifier 1:
Stone Qualifier 2:
Stone Percent:
0
Type:
Linear
Quality 1:
None
Quality 2:
Remarks:
Lining:
None
Greatest Length in meters:
2.3
Greatest width in meters:
0.54
Smallest width in meters:
0.48
Greatest Height in meters:
0.2
Lowest Height in meters:
0.18
Orientation (degrees):
14
Remarks:
| Location | Top Level | Bottom Level |
|---|---|---|
| 5 | 909.51 | 909.21 |
| 11 | 909.41 | 909.28 |
| Relationship | Related to | Related locus |
|---|---|---|
| Under | Earth layer | B8K11:033 |
| Abuts | Wall | B8K11:009 |
| Sealed agnst by | Surface | B8K11:035 |
| Over | Surface | B8K11:038 |
| Number | Date | Baskets | Total | Diagnostic | Published |
|---|
| Date | Photo Number | Subject | Photo |
|---|---|---|---|
| 30 July, 2006 | 06B11398 | Progress |
|
| 2 August, 2006 | 06B11446 | Final Field B |
|
| 30 June, 2008 | 08B11030 | Progress |
|
| 4 July, 2008 | 08B11123 | Progress |
|
| 9 July, 2008 | 08B11203 | Progress |
|
| 29 July, 2008 | 08B11636 | Final: LB building central shrine |
|
| 29 July, 2008 | 08B11622 | Final: LB building |
|
| 29 July, 2008 | 08B11620 | Final: LB building NW part |
|