Locus B.8K11.014

Installation · Pillar base

General Information

Locus Type Installation
Supervisor J. Worthington
Designation Pillar base
Reason Flat topped stone equidistant from Wall 8K10:3 & 8K11:9
Top Separation Clear
Bottom Separation Clear
Start Date 25 July, 2002
End Date 13 July, 2004

Interpretation

Function Poss pillar base with LIR2/P building
Stratigraphy remarks Seems to be founded at bottom of L 6; prob with Pillar Base 13
Balk
Phase
Stratum

Installation Description

Type

Certain:

Probable:

Possible 1:

Pillar base

Possible 2:

Material

Limestone Qualifier 1:

None

Limestone Qualifier 2:

Limestone Percent:

100

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Rectangular

Quality 1:

Nearly

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

0.72

Greatest width in meters:

0.49

Smallest width in meters:

0.15

Greatest Height in meters:

0

Lowest Height in meters:

0

Orientation (degrees):

0

Remarks

Remarks:

Not yet fully excavated

Levels

Location Top Level Bottom Level
8 911.04 910.67

Stratigraphy

Relationship Related to Related locus
Under Earth layer B8K11:006
Over Earth layer B8K11:011

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
25 July, 2002 02B11276 Progress
26 July, 2002 02B11291 Progress
30 July, 2002 02B11337 Final from N
30 July, 2002 02B11338 Final from SW
13 July, 2004 04B11166 Progress
25 June, 2004 04B11002 Cleanup
8 July, 2004 04B11126 Progress
9 July, 2004 04B11139 Progress
12 July, 2004 04B11152 Progress