Locus B.8K11.010

Architecture · N-S wall

General Information

Locus Type Architecture
Supervisor M. Vincent
Designation N-S wall
Reason Prob N extension of 8K01:20
Top Separation
Bottom Separation
Start Date 22 July, 2002
End Date 29 July, 2008

Interpretation

Function N-S wall used as S door jamb for doorway into NW room with cult niche of LB building
Stratigraphy remarks With the divider wall of the LB building; earlier than L 11
Balk N
Phase
Stratum

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

None

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

0

Cobble (6-25 cm) %:

0

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

20

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

0

Lowest Count:

13

Random:

false

Rows

Highest Count:

0

Lowest Count:

2

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

0.4

Greatest width in meters:

0

Smallest width in meters:

1.3

Greatest Height in meters:

0

Lowest Height in meters:

2.3

Orientation (degrees):

14

Dip (degrees):

8

Preservation

Preservation:

Partial Superstructure: Most

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

0.0

Remarks

Remarks:

Wall has splayed apart, prob in an earthquake; original width appears to be 1.10 m

Levels

Location Top Level Bottom Level
34 912.01 909.95
35 0 909.34

Stratigraphy

Relationship Related to Related locus
Under Earth layer B8K11:003
Under Earth layer B8K11:006
Equals Wall B8K01:034
Bonded to Wall B8K01:020
Sealed agnst by Earth layer B8K11:011
Sealed agnst by Earth layer B8K11:018
Sealed agnst by Earth layer B8K11:023
Sealed agnst by Earth layer B8K11:025
Sealed agnst by Earth layer B8K11:026
Sealed agnst by Earth layer B8K11:027
Sealed agnst by Earth layer B8K11:033
Sealed agnst by Surface B8K11:035
Sealed agnst by Surface B8K11:038
Sealed agnst by Surface B8K11:039

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
22 July, 2002 02B11238 Progress
26 July, 2002 02B11291 Progress
30 July, 2002 02B11337 Final from N
30 July, 2002 02B11338 Final from SW
13 July, 2004 04B11166 Progress
14 July, 2004 04B11177 Progress
15 July, 2004 04B11189 Progress
20 July, 2004 04B11229 Progress
21 July, 2004 04B11242 Progress
22 July, 2004 04B11259 Progress
23 July, 2004 04B11278 Progress
26 July, 2004 04B11295 Progress
27 July, 2004 04B11312 Progress
28 July, 2004 04B11339 Progress
28 July, 2004 04B11340 Progress
29 July, 2004 04B11355 Progress
29 July, 2004 04B11357 Progress
2 August, 2004 04B11375 Final from S with people
2 August, 2004 04B11376 Final from S
2 August, 2004 04B11383 Plaster on N face of Wall 15
29 July, 2004 04B11356 Progress
25 June, 2004 04B11005 Pre-ex E balk
29 June, 2004 04B11020 Progress
30 June, 2004 04B11032 Progress
1 July, 2004 04B11049 Progress
25 June, 2004 04B11002 Cleanup
6 July, 2004 04B11097 Progress
7 July, 2004 04B11113 Progress
8 July, 2004 04B11126 Progress
9 July, 2004 04B11139 Progress
12 July, 2004 04B11152 Progress
5 July, 2004 04B11084 Progress
12 July, 2006 06B11163 Progress
13 July, 2006 06B11183 Progress
14 July, 2006 06B11200 Progress
17 July, 2006 06B11218 Progress
18 July, 2006 06B11235 Progress
19 July, 2006 06B11257 Progress
20 July, 2006 06B11272 Progress
24 July, 2006 06B11308 Progress
25 July, 2006 06B11324 Progress
26 July, 2006 06B11342 Progress
26 July, 2006 06B11344 Progress
27 July, 2006 06B11358 Progress
27 July, 2006 06B11359 Progress
28 July, 2006 06B11374 Progress
28 July, 2006 06B11377 Progress
30 July, 2006 06B11399 Progress
30 July, 2006 06B11400 Progress
2 August, 2006 06B11446 Final Field B
30 June, 2008 08B11030 Progress
8 July, 2008 08B11168 Progress
9 July, 2008 08B11203 Progress
29 July, 2008 08B11636 Final: LB building central shrine
29 July, 2008 08B11622 Final: LB building
29 July, 2008 08B11620 Final: LB building NW part
29 July, 2008 08B11628 Final: LB building NW part 2
29 July, 2008 08B11629 Final: LB building 2