Locus B.8K11.009

General Information

Locus Type:

Architecture

Supervisor:

M. Vincent

Designation:

N-S wall

Reason:

Stones in a line

Top Separation:

Bottom Separation:

Start Date:

22 Jul, 2002

End Date:

09 Jul, 2008

Interpretation

Function:

Interior wall of LB building

Stratigraphy remarks:

Earlier than L 11

Balk:

N

Phase:

Stratum :

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

None

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

2

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

0

Cobble (6-25 cm) %:

0

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

40

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

13

Lowest Count:

13

Random:

false

Rows

Highest Count:

0

Lowest Count:

2

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

4.8

Greatest width in meters:

0.98

Smallest width in meters:

0.95

Greatest Height in meters:

2.5

Lowest Height in meters:

2

Orientation (degrees):

14

Dip (degrees):

10

Preservation

Preservation:

Partial Superstructure: Most

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

0.0

Remarks

Remarks:

Bottom not reached in U02, U04, or U06

Levels

Location Top Level Bottom Level
6 911.55 909.21
11 911.47 0
12 911.32 909.51
23 911.61 0
29 911.19 0

Stratigraphy

Under Earth layer B8K11:006
Abutted by Wall B8K11:012
Sealed agnst by Earth layer B8K11:006
Sealed agnst by Earth layer B8K11:011
Sealed agnst by Earth layer B8K11:019
Sealed agnst by Surface B8K11:020
Sealed agnst by Earth layer B8K11:018
Sealed agnst by Earth layer B8K11:023
Sealed agnst by Earth layer B8K11:002
Sealed agnst by Earth layer B8K11:027
Sealed agnst by Earth layer B8K11:033
Sealed agnst by Earth layer B8K11:034
Sealed agnst by Surface B8K11:035
Sealed agnst by Surface B8K11:036
Abutted by Installation B8K11:037
Sealed agnst by Surface B8K11:038
Sealed agnst by Surface B8K11:039

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
22 Jul, 2002 02B11238 Progress
23 Jul, 2002 02B11251 Progress
24 Jul, 2002 02B11263 Progress
25 Jul, 2002 02B11276 Progress
26 Jul, 2002 02B11291 Progress
30 Jul, 2002 02B11337 Final from N
30 Jul, 2002 02B11338 Final from SW
19 Jul, 2004 04B11215 Progress
13 Jul, 2004 04B11166 Progress
14 Jul, 2004 04B11177 Progress
15 Jul, 2004 04B11189 Progress
20 Jul, 2004 04B11229 Progress
21 Jul, 2004 04B11242 Progress
22 Jul, 2004 04B11259 Progress
23 Jul, 2004 04B11278 Progress
23 Jul, 2004 04B11283 Lamp & Wall 9
26 Jul, 2004 04B11295 Progress
27 Jul, 2004 04B11312 Progress
28 Jul, 2004 04B11339 Progress
28 Jul, 2004 04B11340 Progress
29 Jul, 2004 04B11355 Progress
29 Jul, 2004 04B11357 Progress
02 Aug, 2004 04B11375 Final from S with people
02 Aug, 2004 04B11376 Final from S
29 Jul, 2004 04B11356 Progress
25 Jun, 2004 04B11005 Pre-ex E balk
29 Jun, 2004 04B11020 Progress
30 Jun, 2004 04B11032 Progress
25 Jun, 2004 04B11002 Cleanup
06 Jul, 2004 04B11097 Progress
07 Jul, 2004 04B11113 Progress
08 Jul, 2004 04B11126 Progress
09 Jul, 2004 04B11139 Progress
12 Jul, 2004 04B11152 Progress
04 Jul, 2006 06B11046 Progress
06 Jul, 2006 06B11084 Progress
07 Jul, 2006 06B11105 Progress
10 Jul, 2006 06B11124 Progress
11 Jul, 2006 06B11144 Progress
11 Jul, 2006 06B11145 Progress
12 Jul, 2006 06B11163 Progress
13 Jul, 2006 06B11183 Progress
14 Jul, 2006 06B11200 Progress
17 Jul, 2006 06B11218 Progress
18 Jul, 2006 06B11235 Progress
19 Jul, 2006 06B11257 Progress
20 Jul, 2006 06B11272 Progress
21 Jul, 2006 06B11288 Progress
24 Jul, 2006 06B11308 Progress
25 Jul, 2006 06B11323 Progress
25 Jul, 2006 06B11324 Progress
26 Jul, 2006 06B11341 Progress
26 Jul, 2006 06B11342 Progress
26 Jul, 2006 06B11344 Progress
27 Jul, 2006 06B11358 Progress
27 Jul, 2006 06B11359 Progress
28 Jul, 2006 06B11374 Progress
28 Jul, 2006 06B11376 Progress
28 Jul, 2006 06B11377 Progress
30 Jul, 2006 06B11398 Progress
30 Jul, 2006 06B11399 Progress
30 Jul, 2006 06B11400 Progress
31 Jul, 2006 06B11409 Progress
02 Aug, 2006 06B11446 Final Field B
30 Jun, 2008 08B11030 Progress
04 Jul, 2008 08B11123 Progress
08 Jul, 2008 08B11168 Progress
09 Jul, 2008 08B11203 Progress
29 Jul, 2008 08B11636 Final: LB building central shrine
29 Jul, 2008 08B11622 Final: LB building
29 Jul, 2008 08B11620 Final: LB building NW part
29 Jul, 2008 08B11628 Final: LB building NW part 2
29 Jul, 2008 08B11629 Final: LB building 2