Locus B.8K01.053

General Information

Locus Type:

Installation

Supervisor:

W. Bowes

Designation:

Foundation trench along Wall 19

Reason:

Change in color & location along Wall 19

Top Separation:

Clear

Bottom Separation:

Clear

Start Date:

25 Jul, 2002

End Date:

25 Jul, 2002

Interpretation

Function:

FT along Wall 19

Stratigraphy remarks:

Later than Surf 42, earlier than Wall 19

Balk:

Phase:

Stratum :

Installation Description

Type

Certain:

Foundation trench

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Linear

Quality 1:

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

0

Greatest width in meters:

5

Smallest width in meters:

3

Greatest Height in meters:

11

Lowest Height in meters:

10

Orientation (degrees):

0

Remarks

Remarks:

The trench was 35 cm long in the probe that was dug, it is assumed to continue along the other walls in the room

Levels

Location Top Level Bottom Level
34 909.71 909.61

Stratigraphy

Under Surface B8K01:044
Under Earth layer B8K01:041
Under Earth layer B8K01:054
Cuts Surface B8K01:042
FT FT B8K01:053
Fill Loci Earth layer B8K01:054
Under Wall B8K01:019

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
25 Jul, 2002 02B01288 Probe
25 Jul, 2002 02B01289 FT