Locus B.8K01.039

General Information

Locus Type:

Installation

Supervisor:

G. Huffaker

Designation:

Pit into Wall 36

Reason:

Clearance of pit

Top Separation:

Average

Bottom Separation:

Very Clear

Start Date:

30 Jul, 1998

End Date:

05 Aug, 1998

Interpretation

Function:

Pit from LIR2 levels to E robbed part of LB Wall 36

Stratigraphy remarks:

Caused contamination in some LB layers in E room of LB building

Balk:

Phase:

Stratum :

Installation Description

Type

Certain:

Pit

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

None

Earth Qualifier 2:

Earth Percent:

100

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Semi-circular

Quality 1:

Rounded

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1

Greatest width in meters:

0

Smallest width in meters:

0

Greatest Height in meters:

0

Lowest Height in meters:

0.75

Orientation (degrees):

0

Remarks

Remarks:

E part not excavated, in 8K02

Levels

Location Top Level Bottom Level
25 912.04 911.29

Stratigraphy

Under Earth layer B8K01:017
Over Wall B8K01:036
Fill Loci Earth layer B8K01:038

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
27 Jul, 1998 98B01363 Progress
30 Jul, 1998 98B01420 Progress
24 Jul, 1998 98B01345 Progress
23 Jul, 1998 98B01327 Progress
28 Jul, 1998 98B01402 Progress
05 Aug, 1998 98B01495 East room
05 Aug, 1998 98B01496 East room
26 Jun, 2000 00B01011 Pre-excavation
27 Jun, 2000 00B01027 Progress
28 Jun, 2000 00B01044 Progress
29 Jun, 2000 00B01071 Progress