Locus B.8K01.036

General Information

Locus Type:

Architecture

Supervisor:

J. Ponder

Designation:

N-S wall; E wall of E room of LB building

Reason:

Stones in a line

Top Separation:

Bottom Separation:

Start Date:

29 Jul, 1998

End Date:

02 Aug, 2000

Interpretation

Function:

E wall of E room in LB building

Stratigraphy remarks:

LB earth layers run up to it; cut by LIR2 Pit 39

Balk:

Phase:

Stratum :

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

Hard

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

90

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

100

Cobble (6-25 cm) %:

0

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

100

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

0

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

0

Lowest Count:

9

Random:

false

Rows

Highest Count:

0

Lowest Count:

2

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

5.45

Greatest width in meters:

0

Smallest width in meters:

1.1

Greatest Height in meters:

2.35

Lowest Height in meters:

1.5

Orientation (degrees):

18

Dip (degrees):

0

Preservation

Preservation:

Partial Superstructure: Most

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

0.0

Remarks

Remarks:

Partly robbed by LIR2 Pit 39; bulges strongly to W

Levels

Location Top Level Bottom Level
30 912.04 0
36 911.84 909.61

Stratigraphy

Under Earth layer B8K01:017
Cut by Pit B8K01:039
Sealed agnst by Earth layer B8K01:017
Sealed agnst by Earth layer B8K01:026
Sealed agnst by Earth layer B8K01:027
Sealed agnst by Earth layer B8K01:040
Sealed agnst by Earth layer B8K01:041
Sealed agnst by Surface B8K01:042
Sealed agnst by Earth layer B8K01:043
Sealed agnst by Surface B8K01:044
Bonded to Wall B8K01:014
Bonded to Wall B8K01:032

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
30 Jul, 1998 98B01420 Progress
31 Jul, 1998 98B01444 Progress
05 Aug, 1998 98B01495 East room
05 Aug, 1998 98B01496 East room
05 Aug, 1998 98B01499 Entire square
02 Aug, 2000 00B01561 Final LB building
26 Jun, 2000 00B01011 Pre-excavation
27 Jun, 2000 00B01027 Progress
28 Jun, 2000 00B01044 Progress
29 Jun, 2000 00B01071 Progress
30 Jun, 2000 00B01091 Progress
03 Jul, 2000 00B01113 Progress
04 Jul, 2000 00B01126 Progress
05 Jul, 2000 00B01146 Progress
06 Jul, 2000 00B01160 Progress
07 Jul, 2000 00B01186 Progress
10 Jul, 2000 00B01213 Progress
11 Jul, 2000 00B01232 Progress
12 Jul, 2000 00B01255 Progress
13 Jul, 2000 00B01276 Progress
02 Aug, 2000 00B01560 Final E room
14 Jul, 2000 00B01303 Progress
17 Jul, 2000 00B01321 Progress
18 Jul, 2000 00B01342 Progress