Locus B.8K01.035

Installation · Coherent tumble prob from Wall 34

General Information

Locus Type Installation
Supervisor G. Huffaker
Designation Coherent tumble prob from Wall 34
Reason Large upright stone in Wall 21 may be a pillar
Top Separation Average
Bottom Separation Average
Start Date 21 July, 1998
End Date 23 July, 1998

Interpretation

Function Prob tumble from Wall 34
Stratigraphy remarks Next to Wall 34
Balk
Phase
Stratum

Installation Description

Type

Certain:

Probable:

Possible 1:

Pillar

Possible 2:

Material

Limestone Qualifier 1:

Hard

Limestone Qualifier 2:

Limestone Percent:

100

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Cube

Quality 1:

Nearly

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

0.52

Greatest width in meters:

0

Smallest width in meters:

0.32

Greatest Height in meters:

0

Lowest Height in meters:

0.45

Orientation (degrees):

0

Remarks

Remarks:

Originally combined with a stone to S, thinking it may have come from on top of the large stone

Levels

Location Top Level Bottom Level
11 912.34 911.89

Stratigraphy

Relationship Related to Related locus
Under Earth layer B8K01:015
Over Earth layer B8K01:026

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
16 July, 1998 98B01234 Balk removal
22 July, 1998 98B01305 Progress
23 July, 1998 98B01327 Progress
17 July, 1998 98B01252 Balk removal
20 July, 1998 98B01267 Balk removal
21 July, 1998 98B01283 E balk removal