Architecture · N-S wall; N divider wall between 2 rooms of LB building
chert Qualifier 1:
chert Qualifier 2:
chert Qualifier 3:
chert Percent:
0
Limestone Qualifier 1:
Soft
Limestone Qualifier 2:
Limesotne Qualifier 3:
Limestone Percent:
100
basalt Qualifier 1:
basalt Qualifier 2:
basalt Qualifier 3:
basalt Percent:
0
nari Qualifier 1:
nari Qualifier 2:
nari Qualifier 3:
nari Percent:
0
mudbrick Qualifier 1:
mudbrick Qualifier 2:
mudbrick Qualifier 3:
mudbrick Percent:
Arch Frags:
0
Fragment Type:
Quarry:
Cobble (6-25 cm) %:
80
Small Boulder (25-50cm) %:
Medium Boulder (50-75cm) %:
5
Large Boulder (75-100cm) %:
0
Very Large Boulder (>1 m) %:
0
Pebble (.2-6 cm) %:
50
Cobble (6-25 cm) %:
50
Cobble (6-25 cm) %:
100
Small Boulder (25-50cm) %:
0
Medium Boulder (50-75cm) %:
0
Large Boulder (75-100cm) %:
0
Very Large Boulder (>1 m) %:
0
Length (upper):
0.0
Length (lower):
0.0
Width (upper):
0.0
Width (lower):
0.0
Depth (upper):
0.0
Depth (lower):
0.0
Unhewn %:
60
Semi-hewn %:
Dressed %:
0
Ashlar %:
0
Bossed %:
0
Upper Width:
0.0
Lower Width:
0.0
Upper Length:
0.0
Lower Length:
0.0
Sketch:
false
Photo:
false
Dry-laid %:
100
Clay %:
0
Mud %:
0
Cement %:
0
Plaster %:
0
Average Thickness:
0.0
Facing:
Unfaced
Color:
Style:
Boulder & Chink
Support:
Free-standing
Tendencies:
Highest Count:
0
Lowest Count:
11
Random:
false
Highest Count:
0
Lowest Count:
2
Two with Rubble:
Random:
false
Greatest Length in meters:
1.73
Greatest width in meters:
0
Smallest width in meters:
0.98
Greatest Height in meters:
0
Lowest Height in meters:
2.4
Orientation (degrees):
21
Dip (degrees):
0
Preservation:
Partial Superstructure: Most
Lean Direction (degrees):
0
Lean Degrees:
0
Top Foundation Level:
0.0
Remarks:
E part slumped and gradually tumbled to E; top course was reconstructed
| Location | Top Level | Bottom Level |
|---|---|---|
| 10 | 912.12 | 909.58 |
| Relationship | Related to | Related locus |
|---|---|---|
| Under | Earth layer | B8K01:015 |
| Bonded to | Wall | B8K01:021 |
| Sealed agnst by | Earth layer | B8K01:040 |
| Bonded to | Wall | B8K01:020 |
| Sealed agnst by | Earth layer | B8K01:041 |
| Sealed agnst by | Surface | B8K01:042 |
| Sealed agnst by | Earth layer | B8K01:043 |
| Sealed agnst by | Surface | B8K01:044 |
| Sealed agnst by | Earth layer | B8K01:045 |
| Sealed agnst by | Earth layer | B8K01:046 |
| Sealed agnst by | Surface | B8K01:047 |
| Sealed agnst by | Earth layer | B8K01:051 |
| Number | Date | Baskets | Total | Diagnostic | Published |
|---|
| Date | Photo Number | Subject | Photo |
|---|---|---|---|
| 27 July, 1998 | 98B01363 | Progress |
|
| 30 July, 1998 | 98B01420 | Progress |
|
| 31 July, 1998 | 98B01444 | Progress |
|
| 22 July, 1998 | 98B01305 | Progress |
|
| 24 July, 1998 | 98B01345 | Progress |
|
| 3 August, 1998 | 98B01454 | Progress |
|
| 23 July, 1998 | 98B01327 | Progress |
|
| 28 July, 1998 | 98B01402 | Progress |
|
| 5 August, 1998 | 98B01497 | West room |
|
| 5 August, 1998 | 98B01498 | West room |
|
| 21 July, 1998 | 98B01283 | E balk removal |
|
| 5 August, 1998 | 98B01495 | East room |
|
| 5 August, 1998 | 98B01496 | East room |
|
| 5 August, 1998 | 98B01499 | Entire square |
|
| 19 July, 2000 | 00B01369 | Progress |
|
| 20 July, 2000 | 00B01388 | Progress |
|
| 21 July, 2000 | 00B01410 | Progress |
|
| 24 July, 2000 | 00B01433 | Progress |
|
| 25 July, 2000 | 00B01452 | Progress |
|
| 26 July, 2000 | 00B01473 | Progress |
|
| 27 July, 2000 | 00B01492 | Progress |
|
| 28 July, 2000 | 00B01515 | Progress |
|
| 2 August, 2000 | 00B01559 | Final W room |
|
| 2 August, 2000 | 00B01561 | Final LB building |
|
| 26 June, 2000 | 00B01011 | Pre-excavation |
|
| 27 June, 2000 | 00B01027 | Progress |
|
| 28 June, 2000 | 00B01044 | Progress |
|
| 29 June, 2000 | 00B01071 | Progress |
|
| 30 June, 2000 | 00B01091 | Progress |
|
| 3 July, 2000 | 00B01113 | Progress |
|
| 4 July, 2000 | 00B01126 | Progress |
|
| 5 July, 2000 | 00B01146 | Progress |
|
| 6 July, 2000 | 00B01160 | Progress |
|
| 7 July, 2000 | 00B01186 | Progress |
|
| 10 July, 2000 | 00B01213 | Progress |
|
| 11 July, 2000 | 00B01232 | Progress |
|
| 12 July, 2000 | 00B01255 | Progress |
|
| 13 July, 2000 | 00B01276 | Progress |
|
| 2 August, 2000 | 00B01560 | Final E room |
|
| 14 July, 2000 | 00B01303 | Progress |
|
| 17 July, 2000 | 00B01321 | Progress |
|
| 18 July, 2000 | 00B01342 | Progress |
|