Locus B.8K01.013

General Information

Locus Type:

Installation

Supervisor:

J. Old

Designation:

Pillar Base

Reason:

One of four flat, circular stones in a row

Top Separation:

Very Clear

Bottom Separation:

Very Clear

Start Date:

19 Jul, 1996

End Date:

22 Jul, 1996

Interpretation

Function:

Same as L 10

Stratigraphy remarks:

Same as L 10

Balk:

Phase:

Stratum :

Installation Description

Type

Certain:

Probable:

Pillar base

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Hard

Stone Qualifier 2:

Stone Percent:

100

Plan

Type:

Circular

Quality 1:

Nearly

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

0.54

Greatest width in meters:

0

Smallest width in meters:

0.24

Greatest Height in meters:

0

Lowest Height in meters:

0

Orientation (degrees):

0

Remarks

Remarks:

These pillar bases seem to have served in conjunction with L 15 on which a surface may have existed, but for which there is no longer evidence; appears to form a row of pillar bases which apppears to slope in a similar direction of 110 degrees sloping downward at 3 degrees E

Levels

Location Top Level Bottom Level
7 912.69 912.43

Stratigraphy

Under Earth layer B8K01:002
Over Earth layer B8K01:015

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
22 Jul, 1996 96B01179 Progress, pillar bases