Installation · Pillar Base
Certain:
Probable:
Pillar base
Possible 1:
Possible 2:
Limestone Qualifier 1:
Limestone Qualifier 2:
Limestone Percent:
Bedrock Qualifier 1:
Bedrock Qualifier 2:
Bedrock Percent:
0
Ceramic Qualifier 1:
Ceramic Qualifier 2:
Ceramic Percent:
0
Mud Qualifier 1:
Mud Qualifier 2:
Mud Percent:
Mudbrick Qualifier 1:
Mudbrick Qualifier 2:
Mudbrick Percent:
Nari Qualifier 1:
Nari Qualifier 2:
Nari Percent:
0
Plaster Qualifier 1:
Plaster Qualifier 2:
Plaster Percent:
0
Earth Qualifier 1:
Earth Qualifier 2:
Earth Percent:
0
Stone Qualifier 1:
Hard
Stone Qualifier 2:
Stone Percent:
100
Type:
Circular
Quality 1:
nearly
Quality 2:
Remarks:
Lining:
None
Greatest Length in meters:
0.52
Greatest width in meters:
0
Smallest width in meters:
0
Greatest Height in meters:
0
Lowest Height in meters:
0.2
Orientation (degrees):
0
Remarks:
The pillar base appears to have slumped--its top surface slopes 16 degrees at 045 degrees; seems to have served in conjunction with L 15 on which a surface may have existed, but for which there is no longer evidence; appears to form a row of pillar bases which appears to slope in a similar direction of 110 degrees sloping downward at 3 degrees; top is 7 cm above straight line between 13 & 12
| Location | Top Level | Bottom Level |
|---|---|---|
| 8 | 912.66 | 912.43 |
| Relationship | Related to | Related locus |
|---|---|---|
| Under | Earth layer | B8K01:002 |
| Over | Earth layer | B8K01:015 |
| Number | Date | Baskets | Total | Diagnostic | Published |
|---|
| Date | Photo Number | Subject | Photo |
|---|---|---|---|
| 8 July, 1996 | 96B01169 | Progress |
|
| 9 July, 1996 | 96B01170 | Progress |
|
| 10 July, 1996 | 96B01171 | Progress |
|
| 11 July, 1996 | 96B01174 | Progress |
|
| 22 July, 1996 | 96B01179 | Progress, pillar bases |
|