Locus B.8K00.014

Architecture · W wall of LB building

General Information

Locus Type Architecture
Supervisor B. Reiswig
Designation W wall of LB building
Reason Stones in a clear line
Top Separation Average
Bottom Separation Clear
Start Date 11 July, 1996
End Date 29 July, 2008

Interpretation

Function W wall of LB building; rubbly nature of wall on E face may inciate severe earthquake damage; battered into MB rampart near crest
Stratigraphy remarks LB layers run up to it on E; MB layers run up to lowest courses on W; poss 2 phases; poss earthquake damage may have disrupted evidence for a FT on W side; if 2 phases: upper, side wall would be LB; narrower sections may be MB
Balk
Phase
Stratum

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

None

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

10

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

0

Cobble (6-25 cm) %:

100

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

100

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

0

Lowest Count:

15

Random:

false

Rows

Highest Count:

4

Lowest Count:

3

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

3

Greatest width in meters:

1.8

Smallest width in meters:

1.34

Greatest Height in meters:

0.5

Lowest Height in meters:

0.3

Orientation (degrees):

25

Dip (degrees):

0

Preservation

Preservation:

Partial Superstructure: Most

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

Remarks

Remarks:

Bottom not yet reached by U02

Levels

Location Top Level Bottom Level
10 912.48 0
11 912.82 0
16 912.08 0
17 912.13 0

Stratigraphy

Relationship Related to Related locus
Under Earth layer B8K00:018
Sealed agnst by Earth layer B8K00:032
Sealed agnst by Earth layer B8K00:033
Under Earth layer B8K00:017
Sealed agnst by Earth layer B8K00:008
Sealed agnst by Earth layer B8K00:016
Bonded to Wall B8K00:009
Sealed agnst by Earth layer B8K00:016
Over B8K00:038

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
29 June, 1998 98B00014 Progress
8 July, 1998 98B00138 Progress
9 July, 1998 98B00152 Progress
24 July, 1998 98B00346 Progress
27 July, 1998 98B00364 Progress
28 July, 1998 98B00385 Progress
29 July, 1998 98B00403 Progress
30 July, 1998 98B00426 Rampart & walls from N
30 July, 1998 98B00427 Rampart layers from S
30 June, 1998 98B00034 Progress
31 July, 1998 98B00445 Progress
10 July, 1998 98B00171 Progress
13 July, 1998 98B00190 Progress
14 July, 1998 98B00202 Progress
30 July, 1998 98B00421 Progress
26 June, 2000 00B00012 Pre-excavation
27 June, 2000 00B00026 Progress
28 June, 2000 00B00045 Progress
29 June, 2000 00B00072 Progress
30 June, 2000 00B00092 Progress
3 July, 2000 00B00114 Progress
6 July, 2000 00B00161 Progress
7 July, 2000 00B00187 Progress
10 July, 2000 00B00214 Progress
11 July, 2000 00B00233 Progress
12 July, 2000 00B00256 Progress
13 July, 2000 00B00277 Progress
11 July, 1996 96B00146 Progress
18 July, 1996 96B00152 Progress
19 July, 1996 96B00153 Progress & L 17
24 July, 1996 96B00156 Progress
26 July, 1996 96B00158 Wall 14
22 July, 1996 96B00154 L.14
2 July, 2008 08B00073 Progress
3 July, 2008 08B00097 Progress
4 July, 2008 08B00126 Progress
7 July, 2008 08B00149 Progress
29 July, 2008 08B00619 Final: LB Building SW part
29 July, 2008 08B00617 Final: LB building W part
29 July, 2008 08B00618 Final: LB building W part 2
1 July, 2008 08B00051 Progress
4 July, 2008 08B00128 Locus 38