Locus B.7K91.026

Installation · Lower flagstone floor in NE corner of courtyard in EIR1 House b

General Information

Locus Type Installation
Supervisor K. Bramlett
Designation Lower flagstone floor in NE corner of courtyard in EIR1 House b
Reason Flagstones laid together
Top Separation
Bottom Separation
Start Date 22 July, 1994
End Date 27 July, 1994

Interpretation

Function 1st phase of flagstone paving in NE corner of courtyard of EIR1 House B
Stratigraphy remarks Earlier than Surf 25
Balk
Phase
Stratum

Installation Description

Type

Certain:

Pavement

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

None

Stone Qualifier 2:

Stone Percent:

100

Plan

Type:

Rectangular

Quality 1:

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1

Greatest width in meters:

0

Smallest width in meters:

1.4

Greatest Height in meters:

0

Lowest Height in meters:

0

Orientation (degrees):

0

Remarks

Remarks:

Appears to go under the flagstones of Surf 25

Supplements

Additional descriptions recorded later as the locus was further excavated.

Supplement 1

Levels

Location Top Level Bottom Level
29 911.88 0

Stratigraphy

Relationship Related to Related locus
Under Earth layer B7K91:018
Under Surface B7K91:025
Seals against Wall B7K91:016
Seals against Wall B7K91:019

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
25 July, 1994 94B91238 Progress
27 July, 1994 94B91239 Final