Locus Type:
Installation
Supervisor:
K. Bramlett
Designation:
Flagstone floor in N hall N of enclosure in the courtyard of EIR1 House B
Reason:
Flagstones laid together
Top Separation:
Bottom Separation:
Start Date:
22 Jul, 1994
End Date:
27 Jul, 1994
Function:
Latest flagstone floor in NE corner of courtyard (N of enclosure) in EIR1 House B
Stratigraphy remarks:
2nd phase of flagstones above Surf 26
Balk:
Phase:
Stratum :
Certain:
Pavement
Probable:
Possible 1:
Possible 2:
Limestone Qualifier 1:
Limestone Qualifier 2:
Limestone Percent:
Bedrock Qualifier 1:
Bedrock Qualifier 2:
Bedrock Percent:
0
Ceramic Qualifier 1:
Ceramic Qualifier 2:
Ceramic Percent:
0
Mud Qualifier 1:
Mud Qualifier 2:
Mud Percent:
Mudbrick Qualifier 1:
Mudbrick Qualifier 2:
Mudbrick Percent:
Nari Qualifier 1:
Nari Qualifier 2:
Nari Percent:
0
Plaster Qualifier 1:
Plaster Qualifier 2:
Plaster Percent:
0
Earth Qualifier 1:
Earth Qualifier 2:
Earth Percent:
0
Stone Qualifier 1:
None
Stone Qualifier 2:
Stone Percent:
100
Type:
Quality 1:
Quality 2:
Remarks:
Lining:
None
Greatest Length in meters:
1.5
Greatest width in meters:
0
Smallest width in meters:
0.5
Greatest Height in meters:
0
Lowest Height in meters:
0.12
Orientation (degrees):
0
Remarks:
Only four stones remain, but under them is a lower cobble surface L 26
| Location | Top Level | Bottom Level |
|---|---|---|
| 22 | 912.04 | 0 |
| 23 | 912.14 | 0 |
| Under | Earth layer | B7K91:018 |
| Over | Surface | B7K91:026 |
| Number | Date | Baskets | Total | Diagnostic | Published |
|---|