Locus B.7K91.025

Installation · Flagstone floor in N hall N of enclosure in the courtyard of EIR1 House B

General Information

Locus Type Installation
Supervisor K. Bramlett
Designation Flagstone floor in N hall N of enclosure in the courtyard of EIR1 House B
Reason Flagstones laid together
Top Separation
Bottom Separation
Start Date 22 July, 1994
End Date 27 July, 1994

Interpretation

Function Latest flagstone floor in NE corner of courtyard (N of enclosure) in EIR1 House B
Stratigraphy remarks 2nd phase of flagstones above Surf 26
Balk
Phase
Stratum

Installation Description

Type

Certain:

Pavement

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

None

Stone Qualifier 2:

Stone Percent:

100

Plan

Type:

Quality 1:

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1.5

Greatest width in meters:

0

Smallest width in meters:

0.5

Greatest Height in meters:

0

Lowest Height in meters:

0.12

Orientation (degrees):

0

Remarks

Remarks:

Only four stones remain, but under them is a lower cobble surface L 26

Supplements

Additional descriptions recorded later as the locus was further excavated.

Supplement 1

Levels

Location Top Level Bottom Level
22 912.04 0
23 912.14 0

Stratigraphy

Relationship Related to Related locus
Under Earth layer B7K91:018
Over Surface B7K91:026

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
25 July, 1994 94B91238 Progress
27 July, 1994 94B91239 Final