Locus B.7K91.025

General Information

Locus Type:

Installation

Supervisor:

K. Bramlett

Designation:

Flagstone floor in N hall N of enclosure in the courtyard of EIR1 House B

Reason:

Flagstones laid together

Top Separation:

Bottom Separation:

Start Date:

22 Jul, 1994

End Date:

27 Jul, 1994

Interpretation

Function:

Latest flagstone floor in NE corner of courtyard (N of enclosure) in EIR1 House B

Stratigraphy remarks:

2nd phase of flagstones above Surf 26

Balk:

Phase:

Stratum :

Installation Description

Type

Certain:

Pavement

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

None

Stone Qualifier 2:

Stone Percent:

100

Plan

Type:

Quality 1:

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1.5

Greatest width in meters:

0

Smallest width in meters:

0.5

Greatest Height in meters:

0

Lowest Height in meters:

0.12

Orientation (degrees):

0

Remarks

Remarks:

Only four stones remain, but under them is a lower cobble surface L 26

Levels

Location Top Level Bottom Level
22 912.04 0
23 912.14 0

Stratigraphy

Under Earth layer B7K91:018
Over Surface B7K91:026

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
25 Jul, 1994 94B91238 Progress
27 Jul, 1994 94B91239 Final