Locus B.7K82.030

Installation · Pit

General Information

Locus Type Installation
Supervisor C. Rivers
Designation Pit
Reason Looser earth in harder brick detritis
Top Separation Average
Bottom Separation Average
Start Date 21 July, 1998
End Date 26 June, 2000

Interpretation

Function Pit cut into brick destruction L 24
Stratigraphy remarks Dug at some point after the deposition of L 24
Balk N
Phase
Stratum

Installation Description

Type

Certain:

Pit

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

0

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

None

Earth Qualifier 2:

Earth Percent:

100

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Circular

Quality 1:

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1.5

Greatest width in meters:

0

Smallest width in meters:

1.4

Greatest Height in meters:

0

Lowest Height in meters:

0.24

Orientation (degrees):

0

Remarks

Remarks:

Extends into E balk of 7K81; N side nearly vertically cut; loci cut were revealed in N balk

Levels

Location Top Level Bottom Level
7 912.29 912.05

Stratigraphy

Relationship Related to Related locus
Under Earth layer B7K82:002
Cuts Earth layer B7K82:024
Fill Loci Earth layer B7K82:026
Over Earth layer B7K82:044
Over Earth layer B7K82:046
Cuts Earth layer B7K82:039
Cuts Earth layer B7K82:040
Cuts Surface B7K82:041
Cuts Surface B7K82:037

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
22 July, 1998 98B82303 Progress