Locus B.7K82.008

Architecture · N-S wall W of L 6; S part is EIR1; N part is LIR2

General Information

Locus Type Architecture
Supervisor C. Rivers
Designation N-S wall W of L 6; S part is EIR1; N part is LIR2
Reason Line of stones
Top Separation Very Clear
Bottom Separation Very Clear
Start Date 24 July, 1996
End Date 2 August, 2000

Interpretation

Function E wall of building; W wall of room comprised of Walls 8, 11, 5 & 13; S portion forms corner with Wall 13 & goes SW into 7K81
Stratigraphy remarks FT was 7K81:48; seems to have 2 phases; eg the relation to Wall 13, the E end of which is reused & incorporated, & Wall 12; contemporary wih Walls 11 & 5 (also poss Wall 15), but earlier than L 6; later Wall 3 was constructed atop its S end; must divide the wall into 2 parts: the 1st was the S part, constructed in EIR1; the N part was built in LIR2
Balk
Phase
Stratum

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

Hard

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

20

Large Boulder (75-100cm) %:

20

Very Large Boulder (>1 m) %:

50

Chinkstones

Pebble (.2-6 cm) %:

0

Cobble (6-25 cm) %:

100

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

100

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

9

Lowest Count:

7

Random:

false

Rows

Highest Count:

3

Lowest Count:

2

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

2.75

Greatest width in meters:

1.25

Smallest width in meters:

1

Greatest Height in meters:

2.1

Lowest Height in meters:

1.6

Orientation (degrees):

14

Dip (degrees):

3

Preservation

Preservation:

Foundation Only: Partial

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

Remarks

Remarks:

Built up to E end of Wall 13

Levels

Location Top Level Bottom Level
8 912.93 912.33
14 0 912
19 912.77 0
20 912.73 0
25 0 911.43
26 912.81 911.48
31 913.93 0

Stratigraphy

Relationship Related to Related locus
Under Wall B7K82:003
Over Earth layer B7K82:024
Abutted by Wall B7K82:027
Sealed agnst by Earth layer B7K82:002
Sealed agnst by Earth layer B7K82:006
Under Wall B7K82:043
FT FT B7K81:048
Sealed agnst by Earth layer B7K82:021
Sealed agnst by Earth layer B7K81:047
Under Earth layer B7K82:002
Over Wall B7K82:012
Bonded to Wall B7K82:013

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
10 July, 1998 98B82168 Progress
21 July, 1998 98B82281 Progress
30 June, 1998 98B82031 Progress
9 July, 1998 98B82149 Progress
13 July, 1998 98B82187 Progress
23 July, 1998 98B82325 Progress
17 July, 1998 98B82251 Progress
20 July, 1998 98B82266 Progress
29 June, 1998 98B82011 Progress
24 July, 1998 98B82343 Progress
16 July, 1998 98B82320 Progress
28 July, 1998 98B82382 Progress
30 July, 1998 98B82418 Progress
22 July, 1998 98B82303 Progress
27 July, 1998 98B82361 Progress
29 July, 1998 98B82400 Progress
31 July, 1998 98B82442 Progress
3 August, 1998 98B82452 Progress
5 August, 1998 98B82491 Final
5 August, 1998 98B82492 Final
11 July, 2000 00B81230 Progress
2 August, 2000 00B82557 Final
2 August, 2000 00B82558 Final
28 June, 2000 00B81042 Progress
28 June, 2000 00B81080 Surf 46 & FT 48
29 June, 2000 00B81093 Progress
3 July, 2000 00B81119 Surf 46, FT 48, FT 50
4 July, 2000 00B81124 Progress
5 July, 2000 00B81145 Progress
10 July, 2000 00B81211 Progress
6 July, 2000 00B81162 Progress
7 July, 2000 00B81188 Progress
13 July, 2000 00B81274 Progress
26 July, 2000 00B82471 Progress
27 July, 2000 00B82490 Progress
28 July, 2000 00B82513 Progress
24 July, 1996 96K01419 Progress
26 July, 1996 96A79127 Progress