Locus B.7K80.051

Installation · Pit

General Information

Locus Type Installation
Supervisor T. Sanders
Designation Pit
Reason Line between loose & compact earth
Top Separation Clear
Bottom Separation Clear
Start Date 18 July, 1989
End Date 18 July, 1989

Interpretation

Function Pit for storage
Stratigraphy remarks 51 was cut from L 36, a LIR2 surface which seals against the N side of Wall 25; it was cut into L 37, the bricky destruction of EIR1
Balk โ€”
Phase โ€”
Stratum โ€”

Installation Description

Type

Certain:

Pit

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Oval

Quality 1:

Nearly

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1.7

Greatest width in meters:

1.43

Smallest width in meters:

0.8

Greatest Height in meters:

1.09

Lowest Height in meters:

0.8

Orientation (degrees):

0

Remarks

Remarks:

Bell-shaped pit, circular opening with oval bottom

Levels

Location Top Level Bottom Level

Stratigraphy

Relationship Related to Related locus
Cuts Earth layer B7K80:036
Cuts Earth layer B7K80:037

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
18 July, 1989 89B80237 Pit 51