Locus B.7J99.010

General Information

Locus Type:

Installation

Supervisor:

D. Graham

Designation:

Poss pillar base

Reason:

Single isolated stone

Top Separation:

Bottom Separation:

Start Date:

25 Jul, 1994

End Date:

Interpretation

Function:

Prob pillar base to support an upper storey broadroom in EIR1 House B

Stratigraphy remarks:

With Pillar Base 9 and Surf 8

Balk:

Phase:

Stratum :

Installation Description

Type

Certain:

Probable:

Pillar base

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Hard

Stone Qualifier 2:

Stone Percent:

100

Plan

Type:

Rectangular

Quality 1:

Squared

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

0

Greatest width in meters:

0

Smallest width in meters:

0

Greatest Height in meters:

0

Lowest Height in meters:

0

Orientation (degrees):

0

Remarks

Remarks:

Across the room from a similar stone (L 9), similar shape & form; Loca 27, 2 m from perimeter Wall 2

Levels

Location Top Level Bottom Level
22 912.14 0

Stratigraphy

Under Earth layer B7J99:003

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
25 Jul, 1994 94B99300 Progress
26 Jul, 1994 94B99301 Progress
27 Jul, 1994 94B99302 Final B/W
27 Jul, 1994 94B99303 Final B/W
27 Jul, 1994 94B81107 Final - color
27 Jul, 1994 94B90197 Final - color
21 Jul, 1994 94B99299 Progress
22 Jul, 1994 94392 Progress