Locus B.7J89.011

Architecture · Storage room N-S wall

General Information

Locus Type Architecture
Supervisor D. Holloway
Designation Storage room N-S wall
Reason Stones in a line
Top Separation Very Clear
Bottom Separation Very Clear
Start Date 16 July, 1984
End Date 21 July, 1994

Interpretation

Function E wall of the broadroom of House A, bounded by Walls 9 on N, 11 on E, 22 on W, & 27 on S; W wall of paved room with standing stone, extending into 7K80
Stratigraphy remarks All loci seem to be later than Wall 11; it seems to have been forgotten or ignored after its disuse by destruction; walls & surfaces were built on 11 without taking advantage of it as a foundation or divider; Wall 19 abuts it on E; L 19 is oven- & sun-baked mudbrick destruction; contemporary with Walls 9 & 37, making it related to the rooms to E; contemporory with or later than cobble Surf 36 which it overlays on its E face; the founding level was just below the floor surface for the broadroom & was laid at the same level as Wall 9 at the east end
Balk
Phase
Stratum

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

Hard

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

60

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

30

Cobble (6-25 cm) %:

70

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

100

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

6

Lowest Count:

4

Random:

false

Rows

Highest Count:

3

Lowest Count:

2

Two with Rubble:

Random:

true

Measurements

Greatest Length in meters:

3.95

Greatest width in meters:

0.9

Smallest width in meters:

0.8

Greatest Height in meters:

1.42

Lowest Height in meters:

0.7

Orientation (degrees):

22

Dip (degrees):

0

Preservation

Preservation:

Partial Superstructure: Half

Lean Direction (degrees):

295

Lean Degrees:

12

Top Foundation Level:

Remarks

Remarks:

Nearly parallel with Perimeter Wall 22; partially in balk; extends across square to 0.65m from S balk where it ends at door jamb; in S the upper 3 courses are baked to lime in fire, broken, & badly damaged; 6-10 courses preserved above surface; stone tumble in L 29, 30, 31 may come largely from this wall; appears to have had brick superstructure, collapsed eastward into paved room; may have had traces of mud plaster on E face; several courses of badly burned , calcinated & damaged stoned removed at S end; founding level was only reached in probe area

Levels

Location Top Level Bottom Level
11 913.17
17 912.26 911.31
22 913.27 911.92
23 911.97
28 912.72 911.72

Stratigraphy

Relationship Related to Related locus
Under Earth layer B7J89:001
Under Earth layer B7J89:002
Under Earth layer B7J89:008
Under Wall B7J89:005
Under Earth layer B7J89:019
Under Earth layer B7J89:016
Bonded to Wall B7J89:009
Under Earth layer B7J89:029
Sealed agnst by Earth layer B7J89:029
Sealed agnst by Earth layer B7J89:030
Sealed agnst by Earth layer B7J89:031
Sealed agnst by Earth layer B7J89:033
Over Surface B7J89:036
Bonded to Wall B7J89:037
Over Earth layer B7J89:033

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
23 July, 1984 84B89358 Progress
24 July, 1984 84B89379 Progress
25 July, 1984 84B89406 Progress
26 July, 1984 84B89434 Progress
27 July, 1984 84B89453 Progress
30 July, 1984 84B89486 Progress
31 July, 1984 84B89526 Progress
1 August, 1984 84B89544 Progress
16 July, 1984 84B89246 Progress
17 July, 1984 84B89268 Progress
20 July, 1984 84B89335 Progress
6 July, 1992 92B89206 Progress
16 July, 1992 92B89209 Progress
17 July, 1992 92B89210 Progress
20 July, 1992 92B89211 Progress
21 July, 1992 92B89212 Progress
22 July, 1992 92B89213 Progress 7J89 + 7K80
24 July, 1992 92B89220 Final from S
24 July, 1992 92B89-382 Final from S
13 July, 1994 94B89176 Pre-excavation
14 July, 1994 94B89177 Progress
15 July, 1994 94B89178 Progress
13 July, 1994 94290 Pre-excavation
18 July, 1994 94B89180 Progress
20 July, 1994 94B89181 Progress
23 July, 1994 94B89183 Final from W
18 July, 1984 84B89294 Progress
19 July, 1984 84B89318 Progress
4 August, 1989 89B89546 Final
27 June, 1989 89B89177 Progress
28 June, 1989 89B89178 Progress
29 June, 1989 89B89179 Progress
3 July, 1989 89B89181 Progress
12 July, 1989 89B89193 Progress
13 July, 1989 89B89195 Progress
14 July, 1989 89B89196 Progress
4 July, 1989 89B89182 Progress
17 July, 1989 89B89197 Progress
18 July, 1989 89B89198 Progress
7 July, 1989 89B89189 Progress
10 July, 1989 89B89191 Progress
19 July, 1989 89B89199 Progress
20 July, 1989 89B89200 Progress
24 July, 1989 89B89201 Progress
25 July, 1989 89B89203 Mortar & storejar w 11
27 July, 1989 89B89206 Progress
28 July, 1989 89B89207 Progress
31 July, 1989 89B89208 Progress
1 August, 1989 89B89209 Progress
1 August, 1989 89B89211 Pithoi in situ
30 June, 1992 92B89202 Progress
2 July, 1992 92B89204 Progress
3 July, 1992 92B89205 Progress
3 August, 1984 84B89571 NE-stub from W
30 June, 1989 89B89180 Progress
6 July, 1989 891B89012 Progress
2 August, 1989 89B89213 Progress
4 August, 1989 89B89214 Room
19 June, 1992 92B89195 Progress
24 June, 1992 92B89197 Progress
2 August, 1984 84B89575 Final NE corner
2 August, 1984 84B89578 Final NE corner
24 July, 1989 891B89026 Progress
26 July, 1989 891B89029 Progress
4 August, 1989 897B89041 Final from E
23 June, 1992 92B89196 Cleanup
25 June, 1992 92B89198 Progress
25 June, 1992 92B89-078 Bricks
26 June, 1992 92B89200 Progress
29 June, 1992 92B89201 Progress
7 July, 1992 92B89207 Progress
23 July, 1992 92B89-381 Final from N
2 August, 1984 84B89572 Progress
2 August, 1984 84B89576 East balk, south side